Hi Guys
I have the possibility of installing up to a 50 KW system on a light industrial unit in East Sussex. The customer is unsure as to the size of system to install but it could probably be up to 50KW.So far only having installed domestic systems up to 16A per phase and am a little bit daunted by the G59 process. I wanted to try and ascertain from UK Power Networks the feasibility of putting this size of system in. When i contacted them i got sent an email with a 9 page form to fill in!
Questions
1. Is there no way of getting a verbal idea of feasibility without submitting this very long winded application form as cost of upgrading may make it a no goer before we start.
2. Any help on deciphering the G59 process would be greatly appreciated.
Many thanks
I have the possibility of installing up to a 50 KW system on a light industrial unit in East Sussex. The customer is unsure as to the size of system to install but it could probably be up to 50KW.So far only having installed domestic systems up to 16A per phase and am a little bit daunted by the G59 process. I wanted to try and ascertain from UK Power Networks the feasibility of putting this size of system in. When i contacted them i got sent an email with a 9 page form to fill in!
Questions
1. Is there no way of getting a verbal idea of feasibility without submitting this very long winded application form as cost of upgrading may make it a no goer before we start.
2. Any help on deciphering the G59 process would be greatly appreciated.
Many thanks