Hi,
I was wondering if someone could put in quite simple terms, what I will need to do in order to be able to sign off PV panel works.
I'm a qualified electrician but only have my 16th edition and nothing else.. which has been enough to do the work I have been doing, But now I need to up my game if I want to enter solar panel installation.. I have been offered a job and they are willing to take me on and teach me how to install the system but what they need is an electrician that can also at the end of the job, Test, Inspect and sign off the work being carried out...
My question is.. Can I do this with my 17th edition and part P alone, or do I need my 2391 Inspection and testing also..?
Through my research I have also come across MCS Accreditation... Is this needed?
Any information would be a great help, thank you.
Kieran
I was wondering if someone could put in quite simple terms, what I will need to do in order to be able to sign off PV panel works.
I'm a qualified electrician but only have my 16th edition and nothing else.. which has been enough to do the work I have been doing, But now I need to up my game if I want to enter solar panel installation.. I have been offered a job and they are willing to take me on and teach me how to install the system but what they need is an electrician that can also at the end of the job, Test, Inspect and sign off the work being carried out...
My question is.. Can I do this with my 17th edition and part P alone, or do I need my 2391 Inspection and testing also..?
Through my research I have also come across MCS Accreditation... Is this needed?
Any information would be a great help, thank you.