Ok so as I am moving VERY soon I have packed and sealed all my electrical books away. I don't have access to regs consequently. I am racking my brains regards risk assessment for omission of RCD on sockets. If you read the fine print it references a statutory instrument regards the standard this risk assessment must be made to. In my memory it is S.I. 19 HSA available at the HSE site. Can anyone have a look under 433(I think) and tell me what that S.I. is? I need to advise a customer and better get it right.
 

Wilko

Electrician's Arms
Hi - in the 17th Reg 411.3.3 refers. It's Note 3 takes us to App2 item 10 for risk assessment. Not sure if this is it so hit me again if needed.

IMG_1204.JPG
 

essex

Forum Mentor
Electrician's Arms
Trainee Access
It is Reg 411.

17th references ‘SI 1999 No 3242’

18th has removed this reference and instead says risk assessment should involve electrically skilled person.
 

Pete999

Forum Mentor
Electrician's Arms
Trainee Access
Statutory Instruments, followed by a number ie SI 341
 

Vortigern

Regular EF Member
Yeh at 10 on the lower picture @Wilko thanks for that and @essex for the info. That is what I was referring to. Thanks again. Can now finish my email to client!
 

Pete999

Forum Mentor
Electrician's Arms
Trainee Access
Wonder why I bother when I don't get a thanks,:(:joycat::tearsofjoy::sob:
 

Pete999

Forum Mentor
Electrician's Arms
Trainee Access
Maybe it’s because you’ve put the wrong SI number in your post?
I added the number as an example Dave, not as a reference, now stop being picky, anyway the post was meant in jest.
 

westward10

In echoed steps I walk across an empty dream.
Staff member
Moderator
Forum Mentor
Electrician's Arms
Trainee Access
I am interested Vorts why the omission, new install or something with an existing circuit.
 

Pete999

Forum Mentor
Electrician's Arms
Trainee Access
Maybe it’s because you’ve put the wrong SI number in your post?
To be honest, I have just reread the question, my bad I thought that the OP wondered what SI meant, realise he did know, and was just after the number, no excuses, sorry for any confusion.
 
  • Like
Reactions: DPG

Strima

Electrician's Arms
I've recently had a customer and a designer refuse to give me a copy of their risk assessment for omission of RCDs, they expected me to put my name to it.

My comment of 'jog on' in slightly stronger language and my directors pulling the project had the desired impact.
 

Vortigern

Regular EF Member
I am interested Vorts why the omission, new install or something with an existing circuit.
I am/have put a cable in for a comms room on the third floor of a commercial building in a locked cupboard accessible by only competent persons (hrmm. so say!) Anyway I have dropped out of the work because of moving so it's a handover and just advising client I have arranged an RCBO from the LL supply and there is a spare MCB as well. Just a courtesy really for the next guy who finishes it. And thought to advise the client regards RA in leaving out an RCD in this instance. All communications and internet will go through this comms room so it is mission critical and moot as to additional protection. Personally I would put it on an MCB. What say you?
 

westward10

In echoed steps I walk across an empty dream.
Staff member
Moderator
Forum Mentor
Electrician's Arms
Trainee Access
I am/have put a cable in for a comms room on the third floor of a commercial building in a locked cupboard accessible by only competent persons (hrmm. so say!) Anyway I have dropped out of the work because of moving so it's a handover and just advising client I have arranged an RCBO from the LL supply and there is a spare MCB as well. Just a courtesy really for the next guy who finishes it. And thought to advise the client regards RA in leaving out an RCD in this instance. All communications and internet will go through this comms room so it is mission critical and moot as to additional protection. Personally I would put it on an MCB. What say you?
It is not likely to be used for general use whilst it is a comms room so I would omit.
 

Vortigern

Regular EF Member
And it certainly wont be used for equipment outside on the second (correction!) floor. Also it will be a commando socket so even less likely to be used by the cleaner who broke into the comms cupboard.
 

Electrician Talk

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
Electrical 2 Go - Electrical Supplier and Electrical Wholesalers
Electrical Insurance
ElectriciansForums.net (formerly known as ElectriciansForums.co.uk) was setup in April 2006 to provide free electrical advice to both professional and DIY electricians. Whether seeking advice for auto electrics, trying to find electrical installation condition reports (EICR) form downloads, or whether you're here just to talk to other electricians; we've been a first-choice website for tens of thousands of sparkies for well over a decade.
Top