OP
SPARTYKUS
Thats only 4 years thats nothing. What can happen in 4 years?
abbi
the complete RCD protection you have installed covers your 'too high' Zs figures. but with this earthing system the RCDs are only an extra layer of protection, the earthing needs repairing as they are obliged to do.
They can and will. i have watched them dig
up the road/pavement/ huge trench just to fit a new head to an old TNS in central Wolverhampton. It was a lovely job. Best earth you'll get. None of this silly " the laws of physics changed in the 50's" TNCS nonsense!!!
abbi
the complete RCD protection you have installed covers your 'too high' Zs figures. but with this earthing system the RCDs are only an extra layer of protection, the earthing needs repairing as they are obliged to do.
They can and will. i have watched them dig
up the road/pavement/ huge trench just to fit a new head to an old TNS in central Wolverhampton. It was a lovely job. Best earth you'll get. None of this silly " the laws of physics changed in the 50's" TNCS nonsense!!!