Search the forum,

Discuss Who do is responsible for the incoming suppy in the UK Electrical Forum area at ElectriciansForums.net

Reaction score
0
I am doing a new consumer unit install on a second story ex council flat. I’ve notice the mains come in in metal conduit with no CPC. On checking further I’ve seen they have split the neutral before the meter and joined an earth cable onto it creating a pme at the fuse board. I believe this can only be done at the cutout and not in the property. As it’s 2nd floor I can’t TT it. When I get access the main cut out room I’ll do an R2 on the conduit but failing this the dno Uk power networks said it’s only their responsibility up to the cutout so who is responsible from the cut out to the flat? Thanks in advance
 
The owner of the up flat is responsible for the system from incomer to their own mains board via maybe the meter ( not so years ago but there we go)
I used to run a earth in the conduit with the tails if there was Tns or Tnc-s or out via the exit route with a earth and slap a rod in
Where there's a will there's a way
 

Reply to Who do is responsible for the incoming suppy in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock