Questions and electrical advice in the Periodic Inspection Reporting & Certification - This Section is STRICTLY for testing PROBLEMS which members have occured, misunderstood readings, Periodic Inspection Reporting / Electrical Installation Condition Reports, Mathematical Equations/Solutions, Part P and other legislation which require you to Inspect and Test..

Some popular forums: Electrical Forum - Electrical Wiring, Theories and Regulations - Periodic Inspection Reporting & Certification - Electrical Jobs

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z #
  • Sticky
Safe isolation The procedure for proving dead should be by use of a test lamp or two pole voltage detector as recommended in HSE Guidance Note...
Replies
156
Views
190K
  • Sticky
Okay, so this term has come to my attention just now. Never heard of it before in the electrical industry as such. Seems to be brought about by...
Replies
16
Views
13K
Testing Rcd trip times would you write down 28.4ms or 28ms If say 28.6 would you write down 29ms.
Replies
12
Views
1K
I am only asking for YOUR opinion as to what code should be given in an EICR which sees a dry wall fixing box being used for joints behind a...
Replies
4
Views
214
Hello guys, I have a small problem assigning the correct codes for some visual faults. I am still confused and looking forward to find a good...
Replies
10
Views
3K
Just had an EICR, and the tester won't provide a satisfactory certificate until F1 faults are corrected. These mainly consist of locating...
Replies
1
Views
170
happysteve submitted a new resource: EIC - Electrical Installation Certificate - BS7671 2018 + A2:2022 - Fillable EIC PDF form for 18th Edition...
Replies
8
Views
687
  • Question
electricity cuts power to half of apt. and not trip the breaker . also a high pitch shrieking noise. ?
Replies
1
Views
189
We are new landlords and have just got an EICR done. The building is only 5 years old so I am shocked that remedial work has been noted as...
Replies
44
Views
1K
I was registered with the NICEIC until about 3 years ago as a competent person under BS7671, 17th edition. The EICR on my home expires shortly and...
Replies
7
Views
409
P
I know that the 80% values are applied in regards to operating temperature etc but NIC paperwork asks for the max permissible values of bs7671...
Replies
22
Views
13K
happysteve submitted a new resource: EICR - Electrical Installation Condition Report - BS7671 2018 + A2:2022 - Fillable EICR PDF form for 18th...
Replies
4
Views
760
  • Question
Hi guys. Can someone explain what is this? Where are the CPCs connected? I think the black cable connected to the MET have something to do with...
Replies
11
Views
392
Hi all. What are your thoughts on coding type AC RCDs when doing EICR's? I understand the issue on DC currents preventing RCd's from functioning...
Replies
10
Views
532
  • Question
Hi guys. Fuseboard looks fine, but all neutrals are connected at one point outside the fuseboard. That way both rcds trip on fault on any of the...
Replies
14
Views
402
G
hi all, had a bit of a discussion with a guy at work today, carrying out a periodic and there was a circuit wired in flex at the DB, i seem to...
Replies
47
Views
21K
Did a eicr on a upstairs flat, there is 1 main bonding cable from the consumer unit, the gas pipe comes from the gas meter outside and up the wall...
Replies
4
Views
346
Just a quick one When you see two lines on one MCB that could be either a ring or two radials. The only way to determine which is through...
Replies
19
Views
1K
Good evening, I am just wondering whether or not non fire rated downlights should be a coded issue (c3 as many electricians have told me) or...
Replies
13
Views
11K
Eddy Currents submitted a new resource: EICR - Continuation of observations and recommendations - EICR Observation continuation PDF Read more...
Replies
0
Views
171
Hello engineers. I did EICR in two bed rented flat in a block of flats. There is old plastic fuseboard just above the entry door. There are only...
Replies
19
Views
589
happysteve submitted a new resource: Circuit details + test results - extra sheets for EIC/EICR - BS7671 2018 + A2:2022 - Fillable circuit...
Replies
1
Views
419
Two sockets totally inacessable, council electric inspection in a week. Most sockets are accessible
Replies
11
Views
335
  • Question
I all 4 bedrooms in a rented property, there are cheap metal electric wall heaters. By design their cables are made of two wires - no cpc.They are...
Replies
9
Views
354
Evening all, I found my first ever split concentric cable today. Running from an isolator up and into a flat. I was doing an EICR. I could not...
Replies
7
Views
365
Hi all . A question for all . With amendment 2 soon live how do we code. The issue of TYPE AC RCCB’s & RCD’s etc these should now be fitted as...
Replies
10
Views
710
HI Guys and Girls, Sorry been out the game for a while so a bit behind on the regs etc and changes with rental properties on a rental property...
Replies
5
Views
297
I know how I was taught to test a RCD, 6 tests in all two no go, two under 300 mS and 2 under 40 mS with no load. But thinking about it not so...
Replies
7
Views
1K
When installing a new dB with an mcb protecting the spd do you class this as a circuit and include it on the test schedule at cct 1 for example...
Replies
2
Views
414
I have been asked to carry out an eicr at a country club and gym. Large premises. What’s everyone’s thought on price. It would need to be per circuit
Replies
11
Views
492
Hello, Does anyone know the requirements regarding the initial inspection and periodic requirements of domestic turbines? I’ve been told...
Replies
0
Views
192
During a recent EICR I have found 10 mm supply to the flat This is fed from a Locked ryefield DB though a meter then a double pole 100 amp...
Replies
22
Views
3K
Anyone like to code this shocking workmanship
Replies
4
Views
383
Fun EICR at an HMO today, which was installed new 5 years ago (not particularly well!) Lots of niggly things that I'll sort, but in the kitchen...
Replies
61
Views
2K
I've started to move over to AMD 2 forms for my CU installs, if only because the schedule is so much easier to tick and I can stop sticking labels...
Replies
4
Views
479
So I carried out an eicr and discovered a ring within a ring, clearly diy that had been done, unable to locate the point of connection where the...
Replies
4
Views
407
Hi all, have just ordered my first EICR ever for a studio to 1-bed conversion flat in London. It cost a little less than £80 and the electrician...
Replies
45
Views
2K
All - Would appreciate some advise or professional help as I'm facing a £4.5K bill following an EICR which seems to highlight issues that passed...
Replies
21
Views
1K
The purpose of this thread is two-fold: to let you folks see an EICR from someone who's too lazy (or busy) to even bother forging his test...
Replies
15
Views
2K
We carried out an EICR in a large 5 bedroom house for a house purchaser The EICR found various issues with the house from a safety standpoint...
Replies
9
Views
980
Howdy folks. It seems quite a few of us did the 2391 on the same night so I am guessing a few of us will be doing the practical soon. It would be...
Replies
29
Views
6K
Doing an Eicr and the 230v timed class 1 bathroom extractor is less than 200mm next to the shower head. I see this as a C2 and would insist on it...
Replies
11
Views
588
Post a New Thread / Question

New Posts (Please Reply)

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.