Brilliant I was convinced there would be a simple solution and this appears like the perfect one time ( which is Critical ) and cost saving fab thank you
Are they brand specific ??? As you can see the board and incomer Schneider ?
Yeh tried that but as you can see the space is very limited no movement on the existing cables
I wondered whether there was a extender or something similar to allow the second crimp the space it requires
Evening everyone
Can anybody help with a situation I have currently underway
As you can see from the pics I need to double up the crimps on each phase but the incomer isn’t large enough to do so and the bolts are too short
Is there anything I can do to allow me to connect the new phases to the...
I followed ya advice see attachment but having attempted to double bolt the incomer with my feed cable found there wasn’t the room for both bolts really short see pic above
So looks like a jo go
Any thoughts and ideas would be really welcome to make this happen thanks guys
The mccb board will have one 160a three phase breaker on it feeding a solar inverter so if anything the load will be going the other way back into the system rather than drawing from it
Any issues guys with that ???
It’s what my gaffer states just needing to verify