  1. timbobelfast

    Need the right Time Delay Relay

    Can you install a small logic relay or compact PLC? Then you can manipulate the timer(s) all you want
  2. timbobelfast

    Design 2396 Project - 2016

    Hi Speeka, Yes brings back of few memories. Not much support for the 2396 compared with the info available for say the 2391, or whatever it is called these days.... One book that I found useful is https://www.amazon.co.uk/IET-Wiring-Regulations-Verification-Installations/dp/1138606006 Seems...
  3. timbobelfast

    Work Abroad - Middle East

    Pat, get yourself on that Intel job in Kildare. Sparks are taking home 2K a week......
  4. timbobelfast

    High Voltage advice (11KV)

    Ask the gaffer for the HV switching plan, permit to work, risk assessment and scope of works. Chances are they will not be forth coming. What brand of RMU and switch gear are installed?
  5. timbobelfast

    3 Phase power keeps on tripping

    It sounds like a head scratcher indeed. If it continues to trip, check if there is a Telecom Cabin on the rooftop somewhere. As these are normally full of AC-DC rectifiers and PSUs. Failing that, get the LL to have an Electrical Installation Condition Report on the subs and LL services.
  6. timbobelfast

    IT earthing system cable calculation

    Yes , redundancy through out. And yes the VFD board is all DC drilling equipment. You can almost predict when the galley starts preparing meals, as the earth fault alarms ping through when they turn on the grills and hot plates lol!
  7. timbobelfast

    IT earthing system cable calculation

    Lister1987, IT Earthing Systems are common practice for offshore installations. See attached overview of one in the flesh
  8. IT System SLD.JPG

    IT System SLD.JPG

  9. timbobelfast

    IT earthing system cable calculation

    Yes, electrical design software.
  10. timbobelfast

    IT earthing system cable calculation

    Lc1, not sure about Trimble. But ElectricalOM has IT earthing system selection. What are you designing?
  11. timbobelfast

    Compex Training Advice Available

    Go for it Mickey, it will come back to you. Like riding a bike! I've a few compex manuals I can send you if you've got Email. PM the address though so you don't get spammed!
  12. timbobelfast

    Name of Device being used?

    Looks like a 2 / 1 pneumatic valve. 1 port in 2 ports out is my guess.....
  13. timbobelfast

    Current transformer metering producing implausible readings

    As already mentioned, check the CT ratio is correct. Verify they have not used protection type CTs by mistake as these are normally not suitable for metering! And those secondary connections on the CTs need earthed as well for safety!
  14. timbobelfast

    Compex which gland??

    An Ex d gland for Ex ia equipment?? The instructor is talking through his ........ The current refresher format used there is as clear as mud!
  15. timbobelfast

    Do hazardous area light fitting need an internal cut off switch when the cover is opened?

    Doubt that there will be anything in the Intrinsically Safe standards about this (60079-11) It would depend on the certification for the fitting to be honest. Any that I have seen like this are rated for Zone 1 use. I believe the diffuser switch technically allows relamping in the Haz Area...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert