It's genius isn't it?! Had to take that screw in the L bracket out to open the door, hinged from left so now can only open it about 2 inches. Managed to reset breaker on RHS, anything else going to need to remove the whole thing.
Installed this board about Feb last year - small cellar to the side of a bar in a nightclub. At point of installing, it was to house a few small kegs for the limited amount of draft beer they sell and some pre-mix cocktail rubbish that feeds into a touch screen cocktail machine.
Went to do an...
Yes I 100% get what you're saying, but there's probably a lot on the site that needs addressing. The supply is the farmer's problem & up to my customer whether they want to argue the ---- with him. Even if they're happy to pay it's not theirs to start messing with so I've got no power to start...
To be honest PC I didn't do them - MWC doesn't request them, I've arranged access later this week and I'll have a look and should be able to trace the cable back then & do an R1+R2 & try and find the supply to do a Ze. Gut feeling is long, but I'll try the PFC/PSSC trick just to make sure I'm...
Agreed. He collared me without my MFT about the lights, the power circuit has been isolated, they've been notified of the danger & I've been paid, so I'm not quite at the repent stage yet, but I would like to sort it for them (ideally without too much of a ballache).
Hi all,
Went out to fit some LED lights last Friday for a customer who's taken on a small workshop to be mostly used as storage. All fairly straightforward until I came to test for the minor works cert - got a Zs reading at the Db of 2.24 ohms - had a quick look and it's only got a 6mm supply...
I don't know if it's just me but the prices of getting testers calibrated has seemed to have gone through the roof. I appreciate the kit isn't cheap, I got a quote for some myself a few years back, but when the guys drop in to do it in the wholesalers I've also seen how long it takes. I've just...
Does anybody know if there's a minimum csa for final circuits in a portakabin type unit?
They're static, used as a site office & canteen - I've got something in my head about 2.5mm2 tri-rated but not got my books with me, am I getting confused with trailers?
These have been done in 1.5 & 2.5 t&e.
Hi everyone,
I've recently done some testing on some welfare trailers used on building sites on behalf of the rental company at their base. Mixture of fixed wire/PAT/FAT to make sure they're going out to the customer OK.
I've done 8 so far and they were brought brand new 12 months ago and I've...
:p very much above the remit of a PAT tester!
Won't be attempting myself - our sparks will be installing/testing/cert-ing, just like to make sure they're not bull****ing me at times, especially when it's a scenario I've not seen before.
Installation is about 35-40 yrs old
Hi everyone, hope you can help
Recently we've completed an EICR on a commercial property and it's thrown up some issues with the lighting. The installation method is rough as, T&E just chucked on top of the ceiling tiles as we've all seen a million times before so we'll be sorting this as part...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc