Trying out a new scaffolder but I'm unsure of the construction, what do you think?
Initial concerns:
Section of board missing (building side)
No effective kicker board (building side)
Boards overlapping lengthways in middle - not flat
Constructed onto flat roof of unknown integrity and no...
I'm pretty confident it's TT although haven't metered.
Old meter in still in place.
Same Earth cable leaving box can be seen other side of wall connected to Earth rod.
Concentric incoming cable does not look like a TN-S cable.
I'll meter it before making any big decisions
Will recommend a meter upgrade + check to see if TNC-S is available to remove issue of TT tails not being RCD protected.
In the meantime - will fit limiter to EV charger.
Ok interesting thanks. Explains that.
Not much point in uprating them since the meter is only rated for 80A. Looks like I'll have to get the DNO involved and wait for eternity.
In the meantime, I can fit an import limiter to the EV charger.
Evening,
Carried out EV charger installation survey today & found this meter. Is that a 16mm concentric type cable adapter between cutout & meter?
This is a TT installation, tails unprotected. Not sure about installation method of DNO supply.
I'd like to upgrade tails to 25mm between cutout &...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.