two options
option one requires two cables
one cable perm live, neutral, and earth from the boiler fused spur (live to live, neutral to neutral, link live to A)
another cable from the receiver b port to boiler lr
option two 5 core cable from the boiler
boiler side Ls to live, Ns To...