Search results

  1. Brightspark2

    Electrical install by Diesel Pump

    Old topic but to clear things up it isn't as generic as diesel is a hazardous area install Ex rated equipment. A hazardous area is risk assessed and zoned according to the probability, frequency and duration of an explosive gas atmosphere. It isn't down to you as an installer to risk assess...
  2. Brightspark2

    Van deadlocks?

    ArmaDlock I fit onto my vans. http://www.mul-t-lock.com/en/site/mul-t-lock/products/mul-t-lock-vehicle-protection/commercial-vehicle-protection/ArmaDlock/ There not cheap but they work, had attempted break ins before and they could not get past the lock. Bent the door right back but the lock...
  3. Brightspark2

    Recomendations on a suitable harness for IPAF

    I think it needs to be a fixed lanyard. You can usually buy them from the place doing the course too, may be too late to arrange that now though. Sent from my E5823 using Tapatalk
  4. Brightspark2

    Generator.

    Is it necessary to keep the earthing within the building separate for the machine from the main supply earth?. As I understood, an independent earthing system for the generator was required but not throughout the installation. As Dave mentioned that wouldn't be possible anyway due to...
  5. Brightspark2

    Generator.

    The machine will not be linked to the mains Pete as it does not have the capacity for it, so they are looking to supply this from a generator. It will run a couple of times a week. The previous owners used the set up and there looking to do the same. A main supply upgrade is not possible for...
  6. Brightspark2

    Generator.

    We are digressing a bit here, I didn't really want to go into earthing as that isnt in question. But the earthing systems would be interconnected, they would be connected as you say through the extraneous parts, cpcs etc but they would also be interconnected at the MET, where the generator and...
  7. Brightspark2

    Generator.

    Thank you for the reply, The generator earthing would be independent of the main earthing as per the British Standard. I mean the generator suitability and earthing are not in question within this thread. Yes I understand what synchronisation is, I usually have experience with it on sites...
  8. Brightspark2

    Generator.

    Simple specification: A machine inside a small factory is to be supplied from a generator set. This will not be linked to the main supply. The generator is to supply the machine only. Im looking for regulations and advice on this. Ive looked through 515 and in particular 515.7.1, a generator...
  9. Brightspark2

    UPS connection common neutral supply & load

    The neutrals for the circuits you are supplying need to be connected back to the UPS separately. So you would need to split them from the none UPS neutral bar.
  10. Brightspark2

    AM2 assessment

    Its early, I hope that makes sense. Sent from my E5823 using Tapatalk
  11. Brightspark2

    AM2 assessment

    Did you not need to test the voltage at the DOL starter?. By only testing at the motor you haven't proved that the motor may not start up as it is controlled by the starter. The contactor was open so the motor would be dead, but you need to prove the starter isn't going to operate. Sent from...
  12. Brightspark2

    Scrapping armoured

    Was getting about 50p a kilo and £1 odd for low grade the back end of last year. So there can be quite a difference but not worth the bother stripping it on smaller cables IMO Sent from my E5823 using Tapatalk
  13. Brightspark2

    EICR for Transportable/Mobile Building

    Bad decision that. I've still got some paper ones left yet so not to worry. Sent from my E5823 using Tapatalk
  14. Brightspark2

    Scrapping armoured

    Just scrap it as SWA. I do. We don't strip anything under 10/16mm and just scrap the rest as it is. Still get a bit of money for it, better than a kick in ballacks. Sent from my E5823 using Tapatalk
  15. Brightspark2

    Safe Isolation

    Well then you've proved your meter is faulty?. Sent from my E5823 using Tapatalk
  16. Brightspark2

    Safe Isolation

    Depends how your using the word standard Dave. But confirm with manufacturers data that the unit is self testing, GS38 states that to be complaint, the self test system is listed there as a type of 2 probe tester. This gives compliance with EAWR. A system which is safe and compliant. But the...
  17. Brightspark2

    EICR for Transportable/Mobile Building

    We do similar for exhibition trailers. We carry out dead tests and put a separate page with each certificate basically saying that earth fault loop impedance and RCD testing must be done on each connection to site. That goes with the trailer. It's how portacabins come. We buy the paper...
  18. Brightspark2

    Safe Isolation

    If the voltage indicator has 2 forms of indication, ie sound and visual and is classed as self testing then a proving unit is not necessary. So I was taught on my 2391 some years ago and I've stuck with that since. Sent from my E5823 using Tapatalk
  19. Brightspark2

    What is this?wwhat is this?

    Look like just terminal covers...the main switch is just a cover anyway. It's covering the terminals and buss bar. Sent from my E5823 using Tapatalk
  20. Brightspark2

    Fused Spurs under sink?

    They help to stop the electricity from escaping Sent from my E5823 using Tapatalk

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert

Back
Top