Hello all... again :)
If I can see CPC connected correctly at a light fitting, and I have CPC at the switch, but I'm not getting a closed circuit when testing r1+r2 at this one particular light fitting (all the rest in the house are fine, good readings) - what would be an appropriate note to...
Completing my EIC's for assessment tomorrow with the NICEIC ... I'm used to using Elecsa certs and haven't come across 'Reference Method' before.
Changed CU, tested all circuits. Most of the cables are run either through the plasterboard walls (not in conduit, no thermal insulation), or...
Hi,
I am using my own editable EIC (not the Electrical Certificate Software from NICEIC) to print and issue to clients.
When I issue out these certificates to clients, should it have “Certificate Number issued by NICEIC” or can I use my own number sequence? Any feedback on this is much...
What are your guys views on the assesment. what question do they ask and do you have to show them every invoice youve done?
how long does it take for a DI ?
What if you cannot get 2 jobs that uv done because clients away or sold up?
Cheers.
Hello i was hoping someone could advise me on which way to go with this:
I carried out a PIR on a car garage and afterwards explained to the customer the observations/recommenations before i wrote the report up in which i recommended a CU upgrade as the old one had rewireable fuses, nothing...
Ryanw
Thread
before
carried
changed
circuits
complete
eic
out
pir
when filling in the test cert for a new extension ( 4 circuits ) Do you have to fill in the max demand for the whole installation or just the work you carried out and tested?
Hi guys,
This is my first post so here goes....
I recently passed my NICEIC Qualified Supervisor assessment for my company and was wondering where this leaves me on pay & signing of my own private work?
Thanks,
Paul
Hi all During r1 r2, ELI and PFC tests of a lighting circuit would it be a problem to leave lamps and ballasts etc in GN3 shows them out but I can't see a problem
Hi, I am just filling an EIC and I have no difficulty filling in the details for the “Final Circuits” but how do I fill in the details of “Distribution Circuit”?
The circuit in question is for the garage; the SWA cable from main DB terminates on to a mini DB in the garage and the garage has 2...
Evening all,
My son lives in Dublin, he's looking at a property to buy out in the sticks a bit, consist of 3 bed cottage & large no of out buildings which have planning consent for conversion to holiday lets.
He's asked if I would go over & do the electrics, of course I said yes.
I then...
Hi all
I was recently asked to wire 2 newly built houses but was told by the builder I was to expensive. He has now asked me back to connect the circuits that he has installed to the c.u and wants me to supply an E.I.C which I have told him I cannot do asi can only certificate my own work. What...
Hi All
I have just installed a distribution circuit from Farm House to Mobile Home - straight forward job in SWA via Henley block and Switchfuse etc.
The Cut Out was 60A feeding 3036 fuseboard no circuit charts/labels etc typical farm installation.
My qusetion is what do I put in the tick...
Usual nerves but the guy that assessed us today was brilliant, picked us up on a couple of bits and bobs, minor points, but we had some great conversation. thats it, all over and done with for another year.
Have been installing new 20 amp radials for socket outlets and lighting in a newly built office space in a small commercial unit. The new build office is part of a much larger building, and although it has its own CU, this in turn is fed from a 3 phase DB situated in the warehouse area, which in...
Need help from any sparks familiar with wago wiring, started testing today in a new build hospital, all wiring is wago systems with home run boxes etc... Never came across this system and currently doing my dead tests ( r1 + r2 ins res ) however it seems to be a very time consuming task, has...
Just added new circuit to an existing installation - garage supply.
On EIC, particulars of installation at the origin, do I supply the information from the origin of the installion or the new consumer unit in the garage....things such as main switch or circuit breaker section - confused please...
hi just completeing my eic form for my elecsa assesment under details of installation it states extent of the work covered what do people put for a board change please full installation or simply the cu change thanks
Hi all, I went to have a look at a warehouse/office recommission job today, needs reconnection of all circuits and a few new ones to a new 3ph supply.
Question is I know this needs an EIC, so can I do the work and get a registered NIC or ECA spark to test and issue cert?
hi guys
with my yearly inspection comming up i have a job where ive installed a cooker circuit.
15 way cpn split c/u is the existing db in the house (small three bed only).
it has 6 ring circuits 2 radials and 6 lighting circuits. (because it was 2 flats previously)
my question is...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.