K

kung

Had probs with van and had to be dropped off at a job where customer supplies all parts ! eg new socket face plates & switches inc new back boxs as old were surface mounted boxs ! arrived with tools and thats when the bad day started ! yer she got the nice new face plates and when she showed me the 47s dammmmmmmmmmm im sinking them things in engineering ! all i had was a scruch & lump with me ! by the time i left when my lift arrived my hands were dragging alond the floor like a gorilla ! best bit is my vans full of 16s & 25s ! :freak:

anyone else had a bad day lately ?
 
Let that be a lesson to you for agreeing to supplied materials :)
In saying that if the parts were incorrect that should be extra . surely.
 
I did say 25s but my van had to have one of its heads that day and was there for 5hrs before i could get lift back.
 
always said this foreign metric rubbish was confusing. it only came in so froggies could say " i've got 10cm" sounds better than 4".
 
Had probs with van and had to be dropped off at a job where customer supplies all parts ! eg new socket face plates & switches inc new back boxs as old were surface mounted boxs ! arrived with tools and thats when the bad day started ! yer she got the nice new face plates and when she showed me the 47s dammmmmmmmmmm im sinking them things in engineering ! all i had was a scruch & lump with me ! by the time i left when my lift arrived my hands were dragging alond the floor like a gorilla ! best bit is my vans full of 16s & 25s ! :freak:

anyone else had a bad day lately ?

IM FEELING YOUR PAIN :nopity:
 
Did you by any chance have that "sinking" feeling when you arrived on the job
Its enough to drive a man to drink.personally to forget about the day I would have got hammered in the night:26:
 

OFFICIAL SPONSORS

Back
Top