Hi,

no no need for me to say who I am I about but just reading their website, a claim that by 31 he rewired over 3000 houses, and now it's over 5000.

rewire your entire house in a day?

i still to this day find it a load of baloney
5000 and rising every day :) Yes you can rewire a house in a day with right guys and proper planning NOT every house can be done in 1 day but 2 or 3 bed social housing voids not a problem
 
5000 and rising every day :) Yes you can rewire a house in a day with right guys and proper planning NOT every house can be done in 1 day but 2 or 3 bed social housing voids not a problem

I bet they are quality installs ;)
 
On SEC back in the 80s , two is we're on 300 council requires , we managed to a 3 bed semi every two days , that was all mini trucked with toughened pat tresses Hammer screws with rawlplugges combined were used on the trunking for speed , we got into a routine each of us knew where we had to be at any time , it all looked as neat as it could be but it wouldn't be my choice of working Couldn't do it now that's for sure
 
I won't forget the image of the 3" deep chase across the lawn for the SWA...

Hi there Glennban


Ah yes , the old ones are the good ones.
I was just thinking that client of his might still be waiting for a fix on that job A grands a good offer Lol.
 
Are you sure he's not referring to the number of rewires his company has done rather than himself single handed? I think I know who you are talking about, he was a member here but became the subject of a witch hunt by some of our members. If it's who I think it is I rated him highly as a businessman although I was in a small minority.

**edit** here's a link to my past post about him.
yep, and on that thread I linked to a similar company on page 2 of google for requires in glasgow who's page is no longer working so probably out of business.

There's a lesson in there somewhere.
 
My one and only rewire took me approx 3 weeks (full time equivalent) by myself. I work slowly and methodically so perhaps that could be 2 weeks for someone else, thats 10 working days. If there are 4 of you doing it thats 2.5 days it would take, so perhaps 1 day isn't too far off? I do seem to remember the chap saying something along the lines of it wasn't high spec, just a very basic rewire without any bells or whistles..

Good on him if he's doing it properly :-)
 
yep, and on that thread I linked to a similar company on page 2 of google for requires in glasgow who's page is no longer working so probably out of business.

There's a lesson in there somewhere.
I notice the company the OP is on about is now in liquidation....
 
Liquidation cos they a busy poor fools and I'm sure they can rewire a house in 1 day but what state the wiring is is anyones guess

Still see there vans buzzing around
 
We used to 1st fix a 2-6 bed new build in a day no matter what, start at 0600 and finish when its done. Got boring/depressing after 4 years so i moved to a firm that did commercial/industrial and haven't looked back. We do the odd new build so i can show up the containment gurus with my ultra fast clipping.

As for 'wet leaf' i cant fault his website, it looks well presented and laid out. His fault finding skills could do with improvement but with the right team i bet you could smash a rewire in a day..
 

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
uksparks,
Last reply from
Leesparkykent,
Replies
32
Views
1,129
Back
Top