start high for negotiations afterwards,don't budge on price but if you eventually do customer will be happy thinking he got a good deal only knock off 50 quid
 
no one has mentioned time filling in forms,inspection and testing before and afterwards whether it was done over 1 day 2 or three, any chance of more work off customer did the house smell! all i would factor in on a job.
 
You really dragged your heals a bit here didn't you - I would be looking at that in 1 maybe 1 and half days and a charge of about £500 including materials.

You obviously know the layout and difficulty of the OP's job then or else you would not be able to comment the way you have. There is more than one way to complete a job and there are still some customers who prefer quality to a "lashed in" cheap job. The other side of the coin may have been moving furniture and carpets to get access which if the customer is prepared to pay for you to do it go for it

That is why due to the lack of info in the OP it is difficult to pluck a price out of the air all jobs will take as long as they take I dare say we have all had that 8 hours quoted job that's taken 4 and a similar job that has taken 12, we don't whether it is a two up two down or a multi bedroomed detached house the only person who can decide if heels were dragged is the OP
 
you ever go in a house of a mates and their mother has said you wouldnt put them few sockets on for me, and when you go to screw them on, the old plastic boxes threads have gone completely, ends up a hole balls
 
So how can what I said be irrelevent? "overheads" are what you outlined plus things like your insurance. If you don;t know what your overheads or costs are, how can you set your hourly rate?

Suppose, I read your post wrong and commented as seen appropriate
 
500 including materials is a joke! it has to be,
7 x fire rated downlights £70 maybe led bulbs
13 sockets average 2.50 each = £32.50
9 swiches= £10 min
3 lights maybe pendant= £5.00
already up to £117 call it £120
that leaves £380 for 24 hours work
15.88 ph before tax ni running costs etc cable,deisel and a million other things.
nick i would expect your on minnimum wage after all taken into account
 
Last edited by a moderator:
as the op hasn't responded i am wondering if it is a customer looking at what he will get charged?
I would say from the title it looks like the OP has done the work, put in the invoice and got told, "you are ripping me off".

Always agree an upfront ball park figure at the very least.

If the OP feels he has worked sensibly and not delayed then that is how long it took and that is the period of time for which you should charge, however this is one thing with which I have problems, since there is an amazing range of times in which different people feel a job should be completed.
A range of one to three days for a job seems almost impossible variation in speed.
Having said that all jobs are different in nature and unfortunately you never know the specifics until you start work.
 
Thanks for the reply guys. Great help just new to working myself. The job was a bit of a nightmare and customer kept on adding extra work onto job. In future I will be giving price up front to save any problems.
 
Thanks for the reply guys. Great help just new to working myself. The job was a bit of a nightmare and customer kept on adding extra work onto job. In future I will be giving price up front to save any problems.

When you give a price up front, make sure you note what is included so that at the end and extras have been added it'll make the conversation easier with the client. If the job is going on over several days, when they ask for extras make sure you reply stating they are extras too.
 
no1 wants to see you earn a buk , end of............, you got be strong and patient and have negotiating skils..... and lots more
 