G

gottahugenoggin

Hi guys
Im currently studying and ive received my new OSG today.Ive noticed in the general layout of equipment (2.1) they've now done away with the MET and now the main earth is wired direct into the CU earth bar/terminal.Whats the reason for this?
The only reasons i can think of for changing could be there were more terminations that could possibly become loose/cause higher Ze?
Convenience when testing?
Forgive me if this is a simple question,shall i get my helmet on?

Thanks in advance


Dave,nice but dim
 
The earthing bar in CUs has always been able to be an installations MET or EMT!!

Don't make too much out of a simple layout diagram, just because it hasn't been shown, Doesn't mean they have ''done away with the external MET'' ...
 
Last edited by a moderator:
hi Eng 54,thanks for the reply,im not working on CU's but ive seen it done both ways,just by having a nosey at friends and familys installations to familiarise myself to the differant ways things have been done.I was just wondering if the diagrams in the OSG suggested that it should be done this way now,as its changed from the OSG 2008,i just wondered why they have changed the diagram,thanks
 
hi Eng 54,thanks for the reply,im not working on CU's but ive seen it done both ways,just by having a nosey at friends and familys installations to familiarise myself to the differant ways things have been done.I was just wondering if the diagrams in the OSG suggested that it should be done this way now,as its changed from the OSG 2008,i just wondered why they have changed the diagram,thanks

Probably think it looks neater...lol!!
 