Just got out of a small claims court. A technicality just cost me £750!
Goes like this:
I provided an estimate for remedial works left over by a previous electrician who was sacked bt the client. Dont usually take these on but his wife was 9 months prenantand they were desperate to get the bedroom completed.
Raised an estimate with a strong caveat that there may well be more works on further investigation (and there was, shocking work). Started the next day with an email acceptance.
2 1/2 days in with 1/2 a day to go the client sacks me. I raise an invoice for the work done. The client pays the bill under protest and takes out a small claims saying that under the The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 because I didnt give information on cancellation rights I have to refund him the money for my labour so far.
The judge very apologetically agreed on legal grounds and I have to pay the client £750 incl court costs!

Most of my work starts within 14 days and a fair proportion is within 2-3 days of agreeing the estimate. Does anyone have any wording that would satisfy the regulations for work that is cancelled after it has comenced?
Cheers
 
Just got out of a small claims court. A technicality just cost me £750!
Goes like this:
I provided an estimate for remedial works left over by a previous electrician who was sacked bt the client. Dont usually take these on but his wife was 9 months prenantand they were desperate to get the bedroom completed.
Raised an estimate with a strong caveat that there may well be more works on further investigation (and there was, shocking work). Started the next day with an email acceptance.
2 1/2 days in with 1/2 a day to go the client sacks me. I raise an invoice for the work done. The client pays the bill under protest and takes out a small claims saying that under the The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 because I didnt give information on cancellation rights I have to refund him the money for my labour so far.
The judge very apologetically agreed on legal grounds and I have to pay the client £750 incl court costs!

Most of my work starts within 14 days and a fair proportion is within 2-3 days of agreeing the estimate. Does anyone have any wording that would satisfy the regulations for work that is cancelled after it has comenced?
Cheers
What a piece of s***! People like this really boil my wee. Can't you pay them £1 a week or something to really pee them off?
 
Know a plumber in Bristol who had a customer do something very similar, thought he was clever taking plumber to court and getting the money paid back under similar daft laws as above, sacked him after the boiler and heating system was in and certified and about to start the ensuite shower rooms
Ending up costing him several hundred quid.
Now i do not condone this but turned out the customer was renting out the flat on air bnb, seems somebody booked the flat and copied the key! somebody later stole the boiler! not sure who would do such a thing - must be scrap metal thieves;).. they also saw fit to put expanding foam into the pipes and loosen joints. also splashed bright red paint on all the white walls! Would have cost a lot of money to put right... karma is a funny thing and always comes back round..
 
Not good, whilst the law is there to protect the public from unfair tradesmen it can be misused, as in this case, to fleece innocent businesses which should not be possible.

The attached pdf (if the forum allows it) is the schedules 2 and 3 from the legislation that details the information you need to supply.

If you supply a fully featured quote or estimate with your business details on it then the following additional wording could be used to cover the provision of an off premises service contract.
However it is critical that you asses the information needed and ensure you are covered for what you do. This is just an example.

Right to cancel

You have the right to cancel this contract within 14 days without giving any reason. The cancellation period will expire after 14 days from the day of acceptance.
To do so you must clearly inform the company of your decision to cancel this contract (by email or equivalent) before the cancellation period expires.
If you cancel (apart from deductions for loss of value from handling beyond establishing the nature, characteristics and function of the goods and delivery charges above standard delivery) the company will reimburse all payments received from the customer within 14 days or less of the return of goods, if applicable, or the receipt of the cancellation notice, by the original method of payment unless agreed otherwise. Goods must be sent back by the customer within 14 days of the date of cancellation, you will have to bear the direct cost of returning such goods.
If service is requested to start during the cancellation period the customer will pay, in relation to the cost of the contract, a proportional amount relating to the work done until the cancellation took place.
 

Attachments

^^ so we should give that schedule to everybody we give a quote or estimate to?

Madness.
If you do not provide the information about the right to cancel then there is by law no limitation on when a customer can cancel or the amount they can avoid paying.
If you have provided all the information and communicated by email, not just by phone, then the law does provide the protection intended to the customer and does not leave you open to abuse.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

Joined
Location
West London

Thread Information

Title
Cancellation rights trap.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
70
Unsolved
--

Thread Tags

Advert

Thread statistics

Created
Stevesplatto,
Last reply from
MFS Electrical,
Replies
70
Views
10,035

Advert

Back
Top