Rauer
As some of you are aware I've not been going long an got asked to price up for installing 8 spots , 4 ip spots converting a switch from a 2gang to a 4 gang ( dimmer) providing power for a boiler & power for a shower pump, upgrading the earth bonds, and coming back after the kitchen is installed to put a light above a centre island , the spots would be a 2 part process as the ceiling Is being replaced oh and installing undercupboard lights