Hi everyone.
Appreciate your advice here.
I'm meant to be installing a hypervolt home 3 pro EV charger soon.
There is a mains cable in place outside the house but no cat5 cable unfortunately. The customer sent me the hypervolt installation guide from the website, and I was trying to figure out if I needed a LV cable for load management. It mentions in the ALM (automatic load management) section that the ALM can be adjusted to regulate the max.charging current.
My question is, is this a built in laod management system, that can be used without an cat5/6 cable available at the position of the EV charger? I assume the EV charger comes with a CT clamp that will sit at incomer at distribution board? And a result, I can set the ALM to e.g 60A and it'll work that way?
Thanks all
Appreciate your advice here.
I'm meant to be installing a hypervolt home 3 pro EV charger soon.
There is a mains cable in place outside the house but no cat5 cable unfortunately. The customer sent me the hypervolt installation guide from the website, and I was trying to figure out if I needed a LV cable for load management. It mentions in the ALM (automatic load management) section that the ALM can be adjusted to regulate the max.charging current.
My question is, is this a built in laod management system, that can be used without an cat5/6 cable available at the position of the EV charger? I assume the EV charger comes with a CT clamp that will sit at incomer at distribution board? And a result, I can set the ALM to e.g 60A and it'll work that way?
Thanks all