Jul 23, 2008
43
5
83
Hi there

im having an argument with a customer about an office rewire. We agreed day rate but now we are having an argument.

The building is on 4 floors.

The rough spec is

13 storage heaters throughout the building these are not new

There are 2-3 rooms on each floor with dado trunking with cat 5
lighting throughout is cat 2 600x600
Emergency bulkhead lights

submain up to 1st floor with 1st and 2nd floor run back to local db
Modifications to fire alarm but essentially not rewired.

It's pretty basic spec approx 150sqm

can anyone give me a guide price per sq meter?

thanks
 
Hi there

im having an argument with a customer about an office rewire. We agreed day rate but now we are having an argument.

The building is on 4 floors.

The rough spec is

13 storage heaters throughout the building these are not new

There are 2-3 rooms on each floor with dado trunking with cat 5
lighting throughout is cat 2 600x600
Emergency bulkhead lights

submain up to 1st floor with 1st and 2nd floor run back to local db
Modifications to fire alarm but essentially not rewired.

It's pretty basic spec approx 150sqm

can anyone give me a guide price per sq meter?

thanks

What????????
 
Not enough info mate. Just for one example how many 600 x 600 lts? ATM Monkey has the closest guess.
 
Hi there

im having an argument with a customer about an office rewire. We agreed day rate but now we are having an argument.

The building is on 4 floors.

The rough spec is

13 storage heaters throughout the building these are not new

There are 2-3 rooms on each floor with dado trunking with cat 5
lighting throughout is cat 2 600x600
Emergency bulkhead lights

submain up to 1st floor with 1st and 2nd floor run back to local db
Modifications to fire alarm but essentially not rewired.

It's pretty basic spec approx 150sqm

can anyone give me a guide price per sq meter?

thanks

Pathetic
 
  • Like
Reactions: 1 person
Send me the spec and I'll spend the next 4 hours sorting it out.
Second thoughts....I'm just gonna get ready and go for a few jugs.
 
  • Like
Reactions: 1 person
If as you say you have agreed a day rate surely it doesn't matter if you are installing 1 socket or 1000
the only thing missing is an agreed % mark up on materials
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined

Thread Information

Title
Office rewire cost
Prefix
N/A
Forum
Electrician Talk
Start date
Last reply date
Replies
6

Thread Tags

Advert

Thread statistics

Created
19simon,
Last reply from
Mr Mark Sparks,
Replies
6
Views
88

Advert