First of all please dont slaughter me for not seeing something obvious...lol
Thought I would ask this one in here even though it should be under testing forum:
Right we all know what TNS and TT are, yes?
Well, if you have a generator supplying an MDU and the generator is spiked to earth via electrode and the feed to the MDU is a 5 core (3p N and CPC)
is the system classed as TNS or TT seeing as you are not relying on general mass of earth for the return path.
It is no different to a power station supplying , because the generator is in effect the power station.
Can someone shed some light on this for me.
Cheers in Advance
ICE
Thought I would ask this one in here even though it should be under testing forum:
Right we all know what TNS and TT are, yes?
Well, if you have a generator supplying an MDU and the generator is spiked to earth via electrode and the feed to the MDU is a 5 core (3p N and CPC)
is the system classed as TNS or TT seeing as you are not relying on general mass of earth for the return path.
It is no different to a power station supplying , because the generator is in effect the power station.
Can someone shed some light on this for me.
Cheers in Advance
ICE