Hi all
I have just looked at a Job and the client wants most of the sockets and all the switches to have z wave compatibility. He tells me that all boxes have to be 60mm deep as a minimum.
Just wondering if there is a way to have a central controller or all the controllers in the electrical cupboard with the various controlled points wired from there?
Any help or Insight would be good I have looked at the website and it is not that helpful.....
Thanks
I have just looked at a Job and the client wants most of the sockets and all the switches to have z wave compatibility. He tells me that all boxes have to be 60mm deep as a minimum.
Just wondering if there is a way to have a central controller or all the controllers in the electrical cupboard with the various controlled points wired from there?
Any help or Insight would be good I have looked at the website and it is not that helpful.....
Thanks