Hopefully doing nothing, since christmas this is the first time in my working life that I have not worked or been on call during holidays,and boy does it take some getting used to.Dont have call out where I am now so I get a rest,doesnt stop me worrying what I,m going back to though.
 
Nothing planned at all.
Makes a change from my working days, any bank holiday would be switchgear maintenance. No complaints if we were out at one of the remote switching stations. One was very popular with everyone, the chance of a picnic in the Derbyshire dales, it was about a mile from the nearest access road so a nature ramble thrown in as well. And being paid overtime for it! Bit of a sod if we needed to change the oil in any of the switches, it was like Livingstone on safari carrying 25L drums tied to scaffold poles between us.


most of our jobs are in treatment works or borehole suites, and most opf them are in the middle of nowhere. One of them is about 2 miles from a main road, and you drive through this lovelly village to get there. At night, there is absolutely no artificial light. if you listen all you can hear (if the pumps aint running) is the birds. No traffic ect.
Its nestled in this valley, and is very picturesqque. I do enjoy my job. Not so much in the winter though!
 
Why do you think we did the plant switchgear in winter and the out stations in summer.
We had one small substation about 10 minutes drive from the workshop. On 2 – 10 we would be take a picnic and sit on the hilltop above one of Derbyshire’s most beautiful and inaccessible dales.
View attachment 11573
The pump house is off picture to the right and behind the cottages you can just make out the path down the hill from the substation.
 
I know where that is!
Used to go climbing down those parts.
Great walk along the valley from there to Monsal Head. They're opening up the tunnels now, I think.
 
Did you ever come across the insane guy and his dog in the far cottage? The dog would attack first then he’d set about with his walking stick. I had to take my mate to hospital after the dog set about him. The path lead down the sidewall of his garden, on nights we would be blundering along in the dark and the bloody dog would come leaping over the wall.

If you know where it is you’ll understand how I got lost in the fog and drove straight off the lane and in to the river. To get there from work it meant a 16 mile round trip. It was quicker to walk.

When the substation was upgraded it was flown in hanging under a Chinook helicopter, no way was it going to get down the lane.
 
I know where that is!
Used to go climbing down those parts.
Great walk along the valley from there to Monsal Head. They're opening up the tunnels now, I think.

Now that they have opened the tunnels you can get from Bakewell to Blackwell Dale on the Monsal Trail. It gets very busy with both cyclists and walkers and at least two cycle hire businesses have been created on the trail.
 
The sooner they shut down the footpath (or half the width of it) and get the railway working again the better. There would be a direct link then from the quarries to the midlands.

Sorry, I like trains. They make economic sense. At the moment 2000T trains have to slog up hill towards Stockport (Hazel Grove) before they coast down hill towards Sheffield. Reopen the line and it’s down hill to Derby.


Edit: just spoke to the ex-wife, all plans to reopen the line have been put on hold. Bugger!
 
Last edited by a moderator:
Did you ever come across the insane guy and his dog in the far cottage? The dog would attack first then he’d set about with his walking stick. ................................

Fortunately not! We'd park up then hoof it down the valley.

Now that they have opened the tunnels you can get from Bakewell to Blackwell Dale on the Monsal Trail. It gets very busy with both cyclists and walkers and at least two cycle hire businesses have been created on the trail.

One to avoid over the Easter holidays! Save that for a quiet mid week.
The walk along the river is good.

The sooner they shut down the footpath (or half the width of it) and get the railway working again the better. There would be a direct link then from the quarries to the midlands.

Sorry, I like trains. They make economic sense. At the moment 2000T trains have to slog up hill towards Stockport (Hazel Grove) before they coast down hill towards Sheffield. Reopen the line and it’s down hill to Derby.

Me too. If I had my way I'd replace every inch that was axed under Beeching.
They've recently reopened an old track near me for the trams, which is good.
 
Yes it would be brilliant to see the trains back again. We used to watch the Blue Pullman go past when we were kids
 
Me too. If I had my way I'd replace every inch that was axed under Beeching.
They've recently reopened an old track near me for the trams, which is good.

One think made me chuckle when they installed the trams in Nottingham. To get the new tracks across Forest Road they had to burn out the old tram tracks first.

And again to give you a chuckle.
Testing the tram tracks on Waverly Street, Nottingham.

View attachment 11589
 

OFFICIAL SPONSORS

Back
Top