Ok. Replacing a cable to an outbuilding which is currently overhead - the new cable is going under ground and at each end there are 8" concrete walls to go through so I'd like to only have to drill 1 hole!

Customer would like a lighting circuit "extended" to the outbuilding - not an issue but would you run a lighting circuit through the same multicore SWA cable with the power to the outbuilding DB. Obviously labelling/identification of the 2 circuits would be clear at each end!

Thoughts please.
 
Why not take enough for the power down there and take the lighting off that with a fused spur?

The "extra" light would be "switched" from the main building with the other existing outside lights, so they are all switched on together.
 
Last edited by a moderator:
what about adaptable box at both ends and split each time... i dont know the regs inside out to advise you any further son..
 
what about adaptable box at both ends and split each time... i dont know the regs inside out to advise you any further son..

Adaptable boxes are part of the scheme and like you I'm not 100% on the regs and am hoping that some good chap here could say if this is a bad idea...
 
I don't see the problem as long as it is labelled. It is preferable to have one point of isolation for the cable though.You could run the cable through a 4 pole isolator at the supply end, to provide the one point of isolation. Are you planning on using a 4c SWA?
 
i get me green book and would search for hours.. need to start reading/reviewing it agiain....
 
id say better off with six core.... keep it separate, bt what do i knoooooooooooooooo
I don't see the problem as long as it is labelled. It is preferable to have one point of isolation for the cable though.You could run the cable through a 4 pole isolator at the supply end, to provide the one point of isolation. Are you planning on using a 4c SWA?

- - - Updated - - -

but good point johnny which makes sense
 
I don't see the problem as long as it is labelled. It is preferable to have one point of isolation for the cable though.You could run the cable through a 4 pole isolator at the supply end, to provide the one point of isolation. Are you planning on using a 4c SWA?

5 core! Keep the L + N's seperate for each circuit
 
what cpc calculation would be involved here. just asking

have you part p qualification , this is notifiable , i dont care if you are a spark but better have part p qual. lolllllllllll
 
what cpc calculation would be involved here. just asking

have you part p qualification , this is notifiable , i dont care if you are a spark but better have part p qual. lolllllllllll

Yes, Yes I know, but its a replacement & addition so is it notifiable? - and also its a club not a domestic residence and the existing cable is an extreme botch!

Existing power cable is 2.5 T&E, thoughts are to use 5 core 2.5mm SWA, so the combined CPC's of 1.5 power and 1.0 lights, is OK - need to do a more formal check but seems ok in principle.
 
is there any solution for switching the light over the sub-main ? without spending a fortune or going to a lot of bother on it

X10


cef used to have a product in one of their catalogues
 
is there any solution for switching the light over the sub-main ? without spending a fortune or going to a lot of bother on it

X10


cef used to have a product in one of their catalogues

Thought about that. Club is used by so many different people a "simple" light switch is the best way and cheapest.

Where's Malcolm when you need him!
 
what meant was to use seperate lives & overall CPC (SWA). As the CPCcalc that was asked for above, then as long as the CC complies with the most onerous condicitions asked of it by the circuits, then it complies. So in other words if its ok for the sockets, its ok to share it with the lights.
 