H
High Tower
So, popped into a large national estate agents that i work for, to add a couple of sockets for them, simple job, nice and easy with a early finish.
The board was changed and a PIR done in 2010, the companys policy is no codes are acceptable, has to be a clean pass. that in mind have a look at what i came across, the original contractor was a big firm based in Nottingham. no wonder they are always cheper than us!

Cheap crappy CU with 3 blanks missing

Ip Rating compromised

Trunking really has seen better days

6mm2 gas bond on a 100A supply and abandoned switch gear still live

Perfect connections to the time clock!

Is there anything that people wont use a 951 clamp for?
The board was changed and a PIR done in 2010, the companys policy is no codes are acceptable, has to be a clean pass. that in mind have a look at what i came across, the original contractor was a big firm based in Nottingham. no wonder they are always cheper than us!

Cheap crappy CU with 3 blanks missing

Ip Rating compromised

Trunking really has seen better days

6mm2 gas bond on a 100A supply and abandoned switch gear still live

Perfect connections to the time clock!

Is there anything that people wont use a 951 clamp for?