D

Ducksy

Just replaced my first consumer unit (for a family member, just passed my domestic installer assessment).

When filling out the schedule of test results what do you guys put for installation method if you are not 100% sure where the cable is run?

Many thanks.
 
If cable disappears into ceiling, wall etc, and I haven't seen any trunking or conduit anywhere, then I usually put clipped direct. I have sometimes put a note saying I can't be sure as I didn't install it.
 
Thanks king I though as much was just about to rip all the floor boards up and smash the walls in to make sure...........;)
 
Go for it! But as the scope of your cert only covers the CU change and TESTING of the circuits, you're not expected to know everything about the install. You could justify a N/A against items which you genuinely have no idea.
 
Are you talking about the cert though, or the circuit chart which you're supposed to affix near the CU?
 
On both.....so on the schedule of test I put the most relevant install method which is visible and make a note on it saying unknown cable run.

on the schedule of inspections any boxes that relate to cable like (cable in zones) I put as N/A....

King if you was to replace a board and install lets say a new shower circuit at the same time would you put it all on 1 EIC and make note that it covers only the board and new shower circuit or would it be better to issue 2 individual certificates
 
On both.....so on the schedule of test I put the most relevant install method which is visible and make a note on it saying unknown cable run.

on the schedule of inspections any boxes that relate to cable like (cable in zones) I put as N/A....

King if you was to replace a board and install lets say a new shower circuit at the same time would you put it all on 1 EIC and make note that it covers only the board and new shower circuit or would it be better to issue 2 individual certificates


You are issueing the EIC so it would make sense to state: "replacement fuse board/consumer unit, installation of equipotential bonding to incoming gas and water. Installation of new circuit for shower"

Obviously your LABC notification will be similar!
 
One more thing as regards to the above scenario......if before carrying out the board change and shower circuit the property required a EICR would the board change and testing of old circuits negate the need for a EICR because of the issued EIC.

I'm fine with the testing it's just these scenarios I make up confuse the hell out of me lol.

Thanks for your patience and help.
 
One more thing as regards to the above scenario......if before carrying out the board change and shower circuit the property required a EICR would the board change and testing of old circuits negate the need for a EICR because of the issued EIC.

I'm fine with the testing it's just these scenarios I make up confuse the hell out of me lol.

Thanks for your patience and help.

Why is the EICR requested.

An EIC is confirmation of an installation of a new circuit or new board.

An EICR is a condition report and whilst a number of the tests are the same, the inspection of items differs so an EIC can't really be used in place of an EUCR
 
It's just a scenario I've made up....maybe change of occupancy ;)

Thanks doc its what I though just nice to have someone knowledgeable to confirm.
 