glasgospark

planned on doing 2391 but as i have found out it has been replaced with 2395-2396

any one any experience on the 95

any insight would be great
 
2394 Initial Verification of Electrical Installations
2395 Periodic Inspection, Testing and Reporting of Electrical Installations
2396 Design of Electrical Installations

is this it ?
 
i know the 2396 is design and verification cos ive got the info on file from stow college, not sure what the set up is with the new testing courses as i sat the 2391 a few years back

the 2396 is the old 2400
 
i know the 2396 is design and verification cos ive got the info on file from stow college, not sure what the set up is with the new testing courses as i sat the 2391 a few years back

i have enroled for the 2395 at stow, you think there will be differences from 2391
 
i think one part of it is for domestics. Did you ask them to send you some info on it? i just think they split it in two to weed more money out of joe sparks. im hoping i wont be forced through it if they say the 2391 is out dated
 
i think one part of it is for domestics. Did you ask them to send you some info on it? i just think they split it in two to weed more money out of joe sparks. im hoping i wont be forced through it if they say the 2391 is out dated

so looks like its the 2391 in two courses , i will need to look further into it only sent the form couple days ago for the 2395 , starts on the 11th

would you need the 964 firstly ?
 
probably better asking a tutor cos im not sure if the courses are meant to run concurrently or you can do them seperately. you doing night classes then?
 
probably better asking a tutor cos im not sure if the courses are meant to run concurrently or you can do them seperately. you doing night classes then?

not sure , if its available on normal hours i may do that , dont wanto do 1 night a week for 12 weeks

- - - Updated - - -

2391 is legendary!! It should always stand as the mother of all mothers!! Who agrees?

you been drinking ? lol
 
Yeah but if you look at your grade card its 16th edition inspection and testing.......they could easily say its no longer valid and requires an update

testing proceedure hasnt changed much from 15th > 16th > 17th > 17th amd 1.
my jib card says only 2391 Test & Inspect , no edition or date is printed.
so long as you have the current regs course theres no prob.

as for glasgowspark......
2394 - initial testing of new installations
2395 - periodic inspections of existing installations.
both should cover 3 phase stuff so relevent to commercial / ind as well as domestic.
2396 - level 4 electrical design , mainly just commercial.
i'd expect the 2395 to be tougher than the 2394 , but thats just personal opinion :-)
 
No point having just 2395, you want to be doing 2394 too. If you've got the experience and this is just a technicality, you should be able to do them concurrently I think. There's a fair bit of overlap between them but it makes more sense to do the 2394 first. In my 2394 class of all experienced, working electricians, most of them don't have a clue about any of it, from that alone I'd recommend most folk do 2394 first...
 
testing proceedure hasnt changed much from 15th > 16th > 17th > 17th amd 1.
my jib card says only 2391 Test & Inspect , no edition or date is printed.
so long as you have the current regs course theres no prob.

as for glasgowspark......
2394 - initial testing of new installations
2395 - periodic inspections of existing installations.
both should cover 3 phase stuff so relevent to commercial / ind as well as domestic.
2396 - level 4 electrical design , mainly just commercial.
i'd expect the 2395 to be tougher than the 2394 , but thats just personal opinion :-)

Must just be the SJIB doing things differently as per usual.
 