Z

zak-s410

hia everyone newbie to the forum but, ive used it for lots of info in the past. So big thanks


i mainly do domestic rewires in council properties (s**t work) just wondered how quick everybody thats into rewires can connect up a cu. i only use crabtree starbreaker. fastest iv done one is 12min 30 thats with 2 rcbo's and 7 mcbs, im not trying to show off just wondering how fast everyone does them. the bord is fixed onto the wall alrady too.
 
hia everyone newbie to the forum but, ive used it for lots of info in the past. So big thanks


i mainly do domestic rewires in council properties (s**t work) just wondered how quick everybody thats into rewires can connect up a cu. i only use crabtree starbreaker. fastest iv done one is 12min 30 thats with 2 rcbo's and 7 mcbs, im not trying to show off just wondering how fast everyone does them. the bord is fixed onto the wall alrady too.
3 minutes 26 seconds. I think but maybe wrong
 
hia everyone newbie to the forum but, ive used it for lots of info in the past. So big thanks


i mainly do domestic rewires in council properties (s**t work) just wondered how quick everybody thats into rewires can connect up a cu. i only use crabtree starbreaker. fastest iv done one is 12min 30 thats with 2 rcbo's and 7 mcbs, im not trying to show off just wondering how fast everyone does them. the bord is fixed onto the wall alrady too.

bet you smash em in ! bet it wont get tested, rev van up and gone..
 
hia everyone newbie to the forum but, ive used it for lots of info in the past. So big thanks


i mainly do domestic rewires in council properties (s**t work) just wondered how quick everybody thats into rewires can connect up a cu. i only use crabtree starbreaker. fastest iv done one is 12min 30 thats with 2 rcbo's and 7 mcbs, im not trying to show off just wondering how fast everyone does them. the bord is fixed onto the wall alrady too.

Just out of interest, what do you hope to achieve with this information?
 
hia everyone newbie to the forum but, ive used it for lots of info in the past. So big thanks


i mainly do domestic rewires in council properties (s**t work) just wondered how quick everybody thats into rewires can connect up a cu. i only use crabtree starbreaker. fastest iv done one is 12min 30 thats with 2 rcbo's and 7 mcbs, im not trying to show off just wondering how fast everyone does them. the bord is fixed onto the wall alrady too. Scary stuff !
 
bodge it and leg it, any pride in your work? Take it its price work, not day rate?
I did this crash it price work for many years and made some fantastic money in the past. It's got to be the hardest work you could possibly do. Prices are so low now that its sole destroying, putting such a physical and mental demand on your body. Contract rewires can be done to a high standard,( motivation,work rate and system) it's not all " bodge it and leg it"
 
I have never timed myself, it just takes as long as it takes to do the job right and it is different every time
 
I did this crash it price work for many years and made some fantastic money in the past. It's got to be the hardest work you could possibly do. Prices are so low now that its sole destroying, putting such a physical and mental demand on your body. Contract rewires can be done to a high standard,( motivation,work rate and system) it's not all " bodge it and leg it"

poor fish.
 

OFFICIAL SPONSORS

Back
Top