i have done loads of council rewires in orrible properties many years ago, when the firm i worked for got loads of em to do.
the workmanship never altered from that day to this - it was always done right. it was the spec that changed, with surface boxes, trunking across ceilings, and the like. the job was always neat, usually tidy! , and the unit always installed the way they should be.
i don't really know any other way. as much as i'd love you to come work for me and do units in that time, if it wasn't correctly and neatly installed and connected, you wouldn't last 5 mins - or possibly, in your case, 3 mins!