complete

  1. T

    resistance test on shower

    hi there, getting back into things after a serious accident need to get my confidence back. have to do an inisulation test on a shower do i disconnect the shower as it has neon lights in it or do i just complete the test? the double pole switch also has a neon in it ok just to take the switch...
  2. S

    Keeping track of Customers

    Hi guys starting to get a few small jobs in know problem is keeping track of invoices, names,etc. Just was wondering if any of you have found any good software program to keep all this info in? so you can find it easy, IE some kind of database, thats already setup for our kind of work...
  3. A

    I'm looking for work experience to complete my NVQ Level 3

    Hi guys, Is there anyone who's looking for an electrician's mate/improver in the North London area or surroundings? I have passed my 17th Edition and Part P and all I need to become a fully qualified electrician is to complete my NVQ level 3. I'm not expecting a wage. I have a car so I...
  4. M

    Minor works cert sign-off

    Hi Guys, Just completing Y2 L2 2330 (with flying colours) and about to sign-up for L3. As I have been progressing with quals, more and more people (mainly friends and family) are asking if I can do 'a little job for them'. As you would expect, very few are little and require the relevant...
  5. M

    Are Eon complete twonks or am I missing something?

    Hi all. I am going to change my mums Fuse board for an new CU. As I am being inspected on the job by NICEIC I obviously want to do everything to the letter so I had my mum contact her provider - EON - to ask them to fit a DP Isolator and also to change the meter tails to 25mm (which I would...
  6. Dic Penderyn

    Solar Thermal

    Hi there I'm new to the forum!:eek: I have recently purchased a worcester greenstar camray, diferential temp controller and solar panel. However, the storage tanks are made by santon which comes with an installation manual with the schematic diagram that doesn't give reference to the Worchester...
  7. A

    Complete Novice In Need Of Help =(

    Hi, I have been in sales for last 7 years and have finally had enough with the company I work for as it really has no decent prospects for the years to come. I have sat down with my partner over last 6 months discussing a change of career, and after trawling through endless possiblities I have...
  8. I

    2391 questions complete with answers

    hello there peeps for some of you undetaking the 2391 for periodic inspection and testing exam we all know how hard this exam can be, i mananged to aquire a sample questions with answers based on the 17th edition wiring regulations, i think this will be a great study aid for anyone wishin to...
  9. I

    2392 question book with answers

    hello there peeps for some of you undetaking the 2392 initial inspection and testing online exam i think this may be a great study aid , in this online exam theres 50 questions some H&S most testing questions, i mananged to aquire a question book with over 200 questions complete with answers...
  10. I

    2330 level 3 question book

    hello there peeps for some of you undetaking the 2330 level 3 online exam this year i think this may be a great study aid for anyone wishing to complete there exam this year , i mananged to aquire a 2330 level 3 question book saved to disc format, complete with all answers with over 300...
  11. M

    Megger 1552 Crocodile clip

    Hi, Does anyone know where i could get a black crocodile clip for use with the megger 1552? Cheers, Mick
  12. danzor

    JIB Electrotechnical Certification Scheme (ECS) Approved JIB card

    Just in the process of getting my JIB card, I have my 2330 lvl 2+3, 17th and ECS. I was going to sit the NVQ lvl3 last term but opted out purely because I was only interested in domestic work. Now the way work is I work on a big site. Im looking to jump on the olympics-I know you need a JIB...
  13. S

    Complete re-wire

    I have been asked to look at a complete re-wie for a property that has 5 bedrooms, 2 basement rooms, kitchen, 2 bathrooms, lounge and and extension room added at the back. This is my first major job and before i meet the client, i want to be able to give a rough time scale for work completion...
  14. D

    Complete rewire - how much?

    The house i am about to buy is in need of a complete rewire, 3 bed detached, 1970 build in Teesside. The house is empty and there will be no furniture and the carpets will be removed after the re wire. Also the walls will be redecorated. I beleive the ground floor has a concrete floor. How...
  15. S

    Would I complete the NVQ 3 (2356) portfolio with the work that I do?

    Hi guys, I'm new to the game and a soon to be 25yr old/ 2nd year apprentice with an NICEIC Co in London. Our work usually involves doing "voids" and "remedial" work for one of the councils. The work I've been involved in has been for one been rewiring new kitchens. This would involve a 2.5mm...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock