following

  1. C

    Work to be done following periodic inspection

    Hi all Wondering if you can help... I'm in the process of buying a flat and I had an eletrical report done. It says there are some things that need to be done as outlined below. My dad is good at DIY and we're thinking about doing this work by ourselves - or at least some of it. Ideally if I...
  2. sythai

    Following up sent estimates....

    Just seeing what others do... Once you've sent an estimate off. Do you follow it up if you don't hear anything back from the customer or just presume that they don't want you to do the work ? I don't normally bother unless a bit quiet, decent job or have booked in a provisional start date. If...
  3. B

    thinking of moving to sunnier climes your qualified to work in the following

    BS 7671 Adopted by the follow Mauritius, St Lucia, St Vincent, Sierra Leone, Sri Lanka, Trinidad and Tobago and Uganda. So your qualified to work in any of the above, Personally id give Sierra Leone and uganda a miss but it might be useful for our european collegues
  4. S

    Does the following installation require a fused 13A switched spur.

    Does the following installation require a fused 13A switched spur before the SWA. 2.5mm T&E from ground floor ring to IP rated box on outside wall. then SWA 2.5mm from Ground floor ring to garage unit (40A RCD) 16A MCB. then from the garage unit to two metal clad double socket outlets. Thanks
  5. 3

    Retrained following redundancy

    Hello sparks and everyone else. Im new to the forums and looking for a little advice from some of the older 'dogs on the block' :cool: I recently decided to retrain in a trade skill following a redundancy from a 10 year insurance job (blessing in disguise really) and settled on electrical...
  6. A

    following on from the swa thread, kinda.

    I have a neighbour who wants wall lights, they got some but there is not enough space to have either internal or external swa glands as the back box is small and the bulb fitting is right by the incomming hole for the cable. Also I have loads of 2 core swa so was going to use that to keep costs...
  7. T

    Which one of the following statements about a PN junction is NOT TRUE?

    Which one of the following statements about a PN junction is NOT TRUE? (A) It is a junction between P type and N type semiconductor material (B) The depletion region grows smaller when reverse biased (B) Current will flow across the junction when forward biased (C) Used in LEDs (D) Used in...
  8. M

    following orders

    lewis hamilton says he was just following orders when he lied to the stewards has anyone else got into trouble for just following orders?
  9. A

    brief about following Specification

    Signal to Noise Ratio: >105dB Frequency Response: 10Hz - 70kHz +0, -3dB Distortion: < 0.02% @ 4ohms, 20Hz - 20kHz Input Sensitivity: +4dB for rated output Crosstalk: 85dB, 1kHz Output offset: +/- 50 mV, Servo controlled
  10. C

    With no quals, what are my options to install the following?

    Hi everyone! I run a data cabling installation company and need to rack a few brains if that's ok. Until now, I have worked with a local sparky who has taken care of the electrics while we do the data cabling. He's heading abroad so I need to check what my options are here. The electrical...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert