Following on from this thread
http://www.electriciansforums.net/photovoltaic-solar-panels-green-energy-forum/57787-my-mcs-reg-installer-does-not-think-my-4kw-system-needs-registering-dno.html
I've obtained a copy of the G83 notification. The DNO is listed as EDF. I thought it should be UK...
Hi All,
Wonder if you can help me, we have only just become MCS registered and we have our first Solar PV installation planned next week, this is a 4kw but we are using a 3.6 Powerone inverter and it is capped at 16 amps, am i correct in saying that i dont need to prenotify but i have to...
kez001
Thread
already
anyone
correct
dno
drawings
first
installation
notification
hi all,
been looking at the list of notifiable and non-notifable works, and was wondering if someone would be able to clarify some things for me please?
according to this list (courtesy of richard burns - thanks!):
Notifiable work from Part P guide.pdf
a damaged cable can be replaced and is...
Hi people,
When notifying work on the niceic website I pay £1.50 to notify it then £1.50 for a guarantee. My question is can you get rid of the guarantee payment and how? Im doing a lot of single circuits for a new contract so although it doesn't seem a lot it will quickly add up over time...
Frosty69
Thread
certification
certsure
guarantee
industrial
never
niceic
notification
notify
scheme
I forward calls from my landline to iphone when im out and about. The only problem is it doesnt tell me its a diverted call.
My nokia used to show a small symbol which told me i was recieving a diverted call.
Any one else know anything bout this?
Looked everywhere on google and nothing to...
Just wondering what, if anything, people charge for certificates and or notification??
I charge £5 or £10 but I'm getting the feeling that I might be a little on the cheap side??
Hi all
Sorry if this has been covered already, i am filing out my first UK power network commissioning confirmation form and was hoping someone could help me.
In the SSEG rating amps, volts and power factor, are these the maximum values given for the inverter?
and also how would i find the...
I noticed in my paperwork that it refers to submitting a G83 - within 28days of commissioning, is this ontop of supplying the fits forms to your energy company ??
I assume the installer does this and sends it to your energy provider ???
Hi all
I have been asked to remove an immersion heater circuit from an airing cupboard in a bathroom but the client has said the council wants a certificate once the work is complete.
FYI the client is in a council house but has had the ok to remove the immersion tank and cupboard so she can...
DHES
Thread
bathroom
cert
circuit
council
notification
removal
wants
Is it just me, or has everyones email notification of replies to posts you have made stopped working?
Checked the general settings and it is marked correctly, but no emails - will check this later for replies lol!
Hi Guys, as a new member, and having gone through a few posts, found this site interestingly and informatively addictive, and really enjoying it.
One Big problem for me though about notifying the BC. I have a rewire coming up very soon, and I have decided not to notify BC until work is...
RomRobi
Thread
building
building control
control
notification
when
Hi people, just waiting for approved contractor certificate etc from niceic and was basically wanting to know can i fill test sheets and notify on there website or do i still have to spend a bomb on test sheets?
It went really well to start of with, had my on site assessment within two weeks of...
This isn't intended to see who's right or who's wrong just to ask what are we putting on the forms for the questions we scratch our heads on? For a time now I sit and wonder if what I am notifying is correct and so thought I'd ask the censes of opinion. So.............
Three from UK Power...
Hello all.
I have just completed my first install (awaiting Napit MCS inspection next month).
Can i connect to the grid, and send the commisioning forms to the DNO now?.
The DNO forms ask for accreditation/qualification, is part p registered etc ok,
and the MCS just a requirement for FIT...
Have any of you had any experience of an MCS notification not going through or going missing?
I did one for my second job. I am certain I did everything correctly, checking everything. I've done many notifications in the past- hundreds, before i set up my own company and never once had one not...
I went to a job today, the light circuit was protected by a mcb but no RCD. All of the light fittings and switches were metal. I told the house owner that she would be well advised to have an rcd fitted. She didnt seem too bothered. Would it be a bit over the top to issue a danger notification?
I haven't come across this yet but it's only a matter of time.. If I am doing a prework survey and come across a code 1, I have to leave the installation safe. If I haven't got the job yet am I going to have to bill the customer after the survey and immediate remedial work?
As the survey is...
Nicktric
Thread
danger
electric
electrical
notification
quote
when