Indeed, make sure that is set in stone before you even send your price in! Cause if that falls to you at some point and you missed it, your in the brown stuff
 
We like to guess, isit beds sit's, isit flats , isit this, has it got that . I've see me do an extension and its cost +3k

needmoreinfo
 
Total bill for 15 one bed flats everything electric was just over the 30k mark. You need to price in lost days
 
Thanks chaps.. Read all your points . It's bedsits , there already is a three phase supply .. Rooms will be wired in 16mm t&e with 63amp boards in each room.
i will be working alone, Rambo joby!
 
Thanks chaps.. Read all your points . It's bedsits , there already is a three phase supply .. Rooms will be wired in 16mm t&e with 63amp boards in each room.
i will be working alone, Rambo joby!

As soon as i saw the 16mm T&E, I knew exactly how these bedsits were going to be wired, and by who!! ...lol!!
 
Thanks chaps.. Read all your points . It's bedsits , there already is a three phase supply .. Rooms will be wired in 16mm t&e with 63amp boards in each room.
i will be working alone, Rambo joby!

16mm T&E?
On your own?

Oh well, it was good while it lasted ;)
 
What reference method are you running them in? It might have a 3 phase supply but is it a high enough supply just cause it's 3 phase doesn't mean it's currently suitable? And mech protection for the t and e? What are the runs on the t and e? On your own? Haha at least get a mate or two in!!
 