wannabesparky
Tt earthing system
12 way split load wylex consumer unit
100a
100ma time delay rcd
100a main cut out fuse
between the meter and consumer unit is a 63a cut out switch
what ampage should it be between the meter and consumer unit?
As the 63a will trip out before the 100a?
I had a leek from my bathroom and it came through the kitchen light and the 6a mcb tripped out or the 63a tripped out at various stages of turning it back on
sensible answers very much appreciated thank you