I
imago
True enough it wouldn't be necessary most of the time. I just think given the negligable cost involved in strapping steel which has to be there anyway would give a much greater level of flexibility.
The DNO's could use it as the first (or last depending on how you look at it) point of a PME. It's available for emrgency use if faults occur elsewhere. It could be used as a datum for comparisons. The main reason being it's a damn sight easier to put in at build than it is trying to drive rods in afterwards.
Belt and braces really, if the earthing arrangements are way better than they need to be then it allows for redundancy under fault conditions of any other part of the system. Which when you think about it is what earthing is all about in the first place.
The DNO's could use it as the first (or last depending on how you look at it) point of a PME. It's available for emrgency use if faults occur elsewhere. It could be used as a datum for comparisons. The main reason being it's a damn sight easier to put in at build than it is trying to drive rods in afterwards.
Belt and braces really, if the earthing arrangements are way better than they need to be then it allows for redundancy under fault conditions of any other part of the system. Which when you think about it is what earthing is all about in the first place.