amckay, I hope you had someone footing them ladders?!

Regards
Mancunian H&S Nazis




:biggrin5:
ladder is on grass. no way it's going to slip when the ends are bedded in an inch.
 
Pre-apprentice here.. this was some of the college work we did before christmas.. pretty proud of it due to it being my first attempt of conduit and trunking.. only had 1 shot at it as they were trying to save on waste materials.. DSC_0145[1].jpg The entire thing is made from 1 1.5m 50x50 trunking with cover and 1.6m (roughly) of conduit. Hardest part for me was forming the 45 bend on the trunking.
Once it was complete, we did the 3 dead testing procedures: continuity, insulation resistance and polarity. Havent started live testing as of yet.

Didn't do a practical class in secondary school so i don't think my metal work is very good, was interesting to learn though and i'm pretty sure the more you do these things the easier it becomes :)
 
  • Like
Reactions: 6 people
you gents have shown nothing but generosity to everyone on this trainees section.......

i will see if i still have the photos from a couple of installs i done last winter
 
Well lads we have 3 install entries so far, I suppose if no one else enters then 2 of the 3 entrees will win a prize.!!
 
  • Like
Reactions: 1 person
This is quite rubbish, and very simple, but I'll put this up as it was a learning experience.

4 core 4mm SWA, already poked through a plasterboard wall and cut to approximate length, I had to clip it to the wall and terminate in a metal 3P DB. There was an additional 6mm CPC, as the aim was to reduce Zs on the dist board circuits as low as possible.

SWA1.jpg

SWA2.jpg

I was told to cable-tie the CPC to the SWA rather than clip it to the wall. I was told to use a closed 20mm rubber grommet to pass the CPC into the metal DB, rather than use a stuffing gland. The environmental conditions are not onerous at all. The cable is not near/over an escape route, so I was happy to use plastic clips. The run is level, the clips are 400mm apart, as per table D1 in the OSG. Bend radius is about 12cm (minimum ~9cm, table D5).

If I were to do the same job again, with the same limitations on fixing materials, I would measure the distance between the two 90 degree bends and work out how to space the clips evenly (making sure they were spaced <400mm apart), I would try to get the SWA more perpendicular to the top of the DB before making it off, and I would put the cable-ties on the other way round so the knobble was at the top out of the way.

This task (which took me over an hour, including terminating the SWA in the board) taught me that there's quite a lot to think about, even for a seemingly simple task. I know this won't win any medals, but I thought I'd share and I'd welcome any comments. :)
 
  • Like
Reactions: 1 person
Heading of to the big Mainland for a job next week, so will have some pics hopefully! I think we're doing everything from laying 95mm2 3c SWA, and 95mm2 alu singles from plant to switchgear to tranny. and your usual lights sockets conduit/trunking work (plastic) in the fibreglass but. Looking forward to it even more now!! Haha.
 
I'm at college on Wednesday so I'll get some pictures of my bay wall, also doing some panel building with a guy I know on Wednesday evening so I'll get some pics of that and the best pics of the two will be my entry for the comp
 
When I win can I have that Megger think in the first picure? The book doesn't have enough pictures in it for my liking and it's boring so I'll give it a miss if you don't mind.

As usual please mail my prize to Marvo when I win and I'll get it from him later.

Here's a DB I installed. It's pretty damn good and obviously better than the other stuuf shown so far but it's not my best work cause I ran of wire and sleeve so I had to make do with what I had but I think my method of swirling the wiring around the outside is much better and neater.

IMG_4459.jpg
 
^^^ Ok who let Testaccount out of his cage? :rofl:

If you see him, dont approach or try to apprehend him yourself. Please do not feed him after midnight or spill water on him. :rofl:
 
  • Like
Reactions: 1 person
when i win can i have that megger think in the first picure? The book doesn't have enough pictures in it for my liking and it's boring so i'll give it a miss if you don't mind.

As usual please mail my prize to marvo when i win and i'll get it from him later.

Here's a db i installed. It's pretty damn good and obviously better than the other stuuf shown so far but it's not my best work cause i ran of wire and sleeve so i had to make do with what i had but i think my method of swirling the wiring around the outside is much better and neater.

View attachment 27612
i assume that the rat who made that nest is out of shot or deceased.
 
  • Like
Reactions: 1 person
I'll be posting mine up next week when I strip my board and my tutor prints out the possibly new specs. this time around my conduit will be a lot better when i first did that board it was my first attempt at conduit and surprisingly fit together rather well with some "Gentle persuasion" and alot of foul language :lol:

Good luck fellas, a big thank you to GMES and Rob for this comp and being generous enough for these prizes.
 
Last edited by a moderator:
  • Like
Reactions: 1 person
Ok Doody I've made my mind up. Your doing the alarm panel change over a week on Saturday seen as you did a great job on the two new alarm installs last month. Make me proud and do a good job and post it up on here along side your college workshop board.

@ GMES. Is there any rules regarding a Trainee posting up more than one install/location?
 
Ok Doody I've made my mind up. Your doing the alarm panel change over a week on Saturday seen as you did a great job on the two new alarm installs last month. Make me proud and do a good job and post it up on here along side your college workshop board.

@ GMES. Is there any rules regarding a Trainee posting up more than one install/location?
I get a little OCD with alarm panels ... Rather annoys me that the bellbox in that new build is using a different colour code to the rest of the zones :lol: and sweet, let me know when and I'll post both up that if it's okay to?
 
Don't see why not, they can't be chosen to win both prizes though.

Two people = 2 prizes, I agree with that Rob.

I get a little OCD with alarm panels ... Rather annoys me that the bellbox in that new build is using a different colour code to the rest of the zones :lol: and sweet, let me know when and I'll post both up that if it's okay to?

The colours are only identification of conductors, up to you what to use for the bellbox. The PIR's are diffrent lol. Post up both Doody.

@ Paul, I can't see why not mate.

Rob and GMES, good call allowing one entrant to post more than one picture. I like that.
 
2015-01-21 15.17.06.jpgCollege work of the day was a Lighting circuit with a ring circuit.. nothing fancy but we had to make sure it was tidy as being used as a display peice.. the twin and earth cable is not the best to be honest..
 
  • Like
Reactions: 3 people

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
********Competition Time***********
Prefix
N/A
Forum
Electrical Course Trainees Only
Start date
Last reply date
Replies
169

Thread Tags

Tags Tags
time

Advert

Thread statistics

Created
GMES,
Last reply from
Paul.M,
Replies
169
Views
3,605

Advert