D
davidcaulfield
I always mount my CU on ply board and batten them off to bring cables through the back. Is this allowed for my NICEIC inspection? Or is it a fire risk?
I always mount my CU on ply board and batten them off to bring cables through the back. Is this allowed for my NICEIC inspection? Or is it a fire risk?
Ok does bs7671 allow it