G
Spot on with the panel board and pretty obvious that there are unknown factors.
Regarding the diversity, try a major school kitchen any morning of a working week. It is hectic and everything is operating. Did some work on one last year (6mm 4 core pyro blown) with 5 3ph ranges all operating on full, 2 extras (one down) on standby and then there's the ovens, warmers, etc. It's that 3 or 4 hour period. 400amp MCCB.
Them kids want their din dins. lol.
Well there's no accounting for bad design, is there!! lol!! Lost count of the amount of commerical kitchens on the various projocts i've been involved with, and diversisty has Alway's played a role, in the design to the supplies to these kitchens.
Nothing bad by the initial designer, I'll wager. It's when the initial installation is 20-30 years old, and there have been that many additions, etc...but who's bothered about supply facilities.
Panel ain't here yet, not that il get to touch as stuck in grid ceiling fitting trunking.lol
but he has out through order saying swa used as earth, investigation needed.... Il not be signing off if they don't pull in earth was his words... 70mm 4c