Hi. DIY-er here just seeking views before I speak to DNO, Supplier and my Electrician. Our electricity hub is in our underhouse garage where the walls are a bit damp. I'm in the process of damproofing, studding and fire boarding the walls but the corner where all the electric stuff is is probably the worse damp wise...and of course its very congested there too now we've added EV, solar PV and maybe a ASHP too.
As a solution to the damp I was thinking of getting my electrician to disconnect (from the wall anyway) the EV charger, Solar PV inverter, switches etc and the solar meter from the side wall and secure them somehow - then I continue the damp proofing and boarding. The disconnected stuff could then be put back neatly, leaving space for cut out, meter and CU to be relocated. Once all that's been relocated I can then damp and board the end wall. All of this without having to lose power for a few days.
Question 1. Is it in the regs to attach meters, cut outs and CUs directly to pink fire rated plasterboard? I would probably reinforce behind the plasterboard with more noggins. If not, it looks like 2ft x 2ft is the biggest fire rated backboard available (which I can use 2-4 of) or is there supplier of larger ones?
Question 2: It's less than 1 metre extra cable needed for the cut out and everything else to go on that side wall. Can the DNO put a joint in the mains cable or does it have to be a clean run all the way from the road to the meter? I'm just thinking if its a crazy amount of money just for a little bit more.
Thanks if you are able to advise.
As a solution to the damp I was thinking of getting my electrician to disconnect (from the wall anyway) the EV charger, Solar PV inverter, switches etc and the solar meter from the side wall and secure them somehow - then I continue the damp proofing and boarding. The disconnected stuff could then be put back neatly, leaving space for cut out, meter and CU to be relocated. Once all that's been relocated I can then damp and board the end wall. All of this without having to lose power for a few days.
Question 1. Is it in the regs to attach meters, cut outs and CUs directly to pink fire rated plasterboard? I would probably reinforce behind the plasterboard with more noggins. If not, it looks like 2ft x 2ft is the biggest fire rated backboard available (which I can use 2-4 of) or is there supplier of larger ones?
Question 2: It's less than 1 metre extra cable needed for the cut out and everything else to go on that side wall. Can the DNO put a joint in the mains cable or does it have to be a clean run all the way from the road to the meter? I'm just thinking if its a crazy amount of money just for a little bit more.
Thanks if you are able to advise.
The red square is where I think everything could be moved to. 