The main reason i haven't bought them, is that i not yet got into a situation where i've thought 'i wish there was some gadget that would make this easier'.

Thats the trouble with you young'uns. Always want the easy way!
:D
 
"is that i not yet got" LOL LOL

That's the trouble with you "oadun's" you still like to resist change and spend all day faffing.:D
 
I like coffee, I'm gettin some....:D
ffffffff

Yeah, I've made my own adaptors for "kliks" and the like, just put a single socket in the other end of the plug flex.
even better.
the kit looks good though---dunno about the 55 quid mind.
There are so many variations though,that aren't covered,such as those gu 10's that only take cfls(sgu10 i think they're called),Ges,pl etc.
One of the meters I had been using a little while back had a adapter on the earth probe that you could plug in your N probe,which gave you a spare hand to hold onto your steps.Your test is between phase and earth.
(croc clip on earth)
 
Last edited:
lol well thanks all for suggestions....hmm i might have to have a looky into the plug in adapters...make my life alot easier as yet again today.....eli at a pendant....did it the old fashioned way though....wish i had pointier elbows to press the test button hehe.
 

OFFICIAL SPONSORS

Back
Top