D
Davem
Hey guys just a quick question I have got a job on supplying a shed from a first floor CU. would a feed from the board in flat 6mm to an outside junction box then 6 mm SWA from the junction box to the sub board in the shed. Although the earths connected in the JB would be of different sizes I.e 6mm and 2.5mm is this ok or is there a different method I could do this ?? Any info much appreciated
so rather than goin inside the house with SWA I have drilled out with 6 mm T&E and connect up in JB but I need to run some 6mm earth to JB as the earth in the T&E isn't sufficient am I right ??