nisioptimum

Had Freedom out to supply PME to house as house never had an earth, built in 1900s. OK they charge 160 quid but turned when arranged explained that it was best to power down computers etc before power was turn off and waited until she said everything ready. I also mention the old cables they were replacing ran through some very old metal conduit would they get rid of it while they were here. An isolator switch had been asked for but they had none in store when collecting gear this morning. Arranged to come back early next week to fit and said no need for job sheet until they finished. Nice neat job tidy up, got rid of conduit and gave their mobile number for any issues etc. Nice to meet lads that cared about their work and did a good job.
 
Everybody hears the moans and groans of bad jobs, now's the time to wave the flags and blow the trumpets for the people who are proud of the good job they do. Report them to their bosses, every brownie point counts.
 
Everybody hears the moans and groans of bad jobs, now's the time to wave the flags and blow the trumpets for the people who are proud of the good job they do. Report them to their bosses, every brownie point counts.
Good idea will give them a bell and email I complain when warrented so I should when something is good
 
Had Freedom out to supply PME to house as house never had an earth, built in 1900s. OK they charge 160 quid but turned when arranged explained that it was best to power down computers etc before power was turn off and waited until she said everything ready. I also mention the old cables they were replacing ran through some very old metal conduit would they get rid of it while they were here. An isolator switch had been asked for but they had none in store when collecting gear this morning. Arranged to come back early next week to fit and said no need for job sheet until they finished. Nice neat job tidy up, got rid of conduit and gave their mobile number for any issues etc. Nice to meet lads that cared about their work and did a good job.

OK, ...but what you have described above is a bit more than just PME'ing a service head. To my mind charging £160 for what is normally a 10 minute job is OTT.... Especially when the old Regional Boards did it free of charge. It's only relatively recently that some DNO'S have started charging for a PME connection. Come to that, the DNO's should be providing isolators as a matter of course, you've paid for any materials and labour thousands of times over and then some, in standing charges!!
 
Had Freedom out to supply PME to house as house never had an earth, built in 1900s. OK they charge 160 quid but turned when arranged explained that it was best to power down computers etc before power was turn off and waited until she said everything ready. I also mention the old cables they were replacing ran through some very old metal conduit would they get rid of it while they were here. An isolator switch had been asked for but they had none in store when collecting gear this morning. Arranged to come back early next week to fit and said no need for job sheet until they finished. Nice neat job tidy up, got rid of conduit and gave their mobile number for any issues etc. Nice to meet lads that cared about their work and did a good job.


So they came out and did a job like they should of done it for a higher than average cost, and still havent completed it......well done lads.......oh hang on you forgot the isolator switch, then again thats understandable as the list of required materials you needed for the job must have been pretty extensive, and those are just so hard to come by locally. Service block...check, 1 meter of earth cable, check, Double pole isolator switch......DOH!

at least they wont have charged you yet for the works until its complete though right?..........oh they have charged you already?..............

whats the chances the isolator will turn up next week??
 
OK, ...but what you have described above is a bit more than just PME'ing a service head. To my mind charging £160 for what is normally a 10 minute job is OTT.... Especially when the old Regional Boards did it free of charge. It's only relatively recently that some DNO'S have started charging for a PME connection. Come to that, the DNO's should be providing isolators as a matter of course, you've paid for any materials and labour thousands of times over and then some, in standing charges!!

Problem now is the DNO is responsible for the supply only up to the outgoing terminals on their cutout. The meter and outgoing side is the responsibility of the supplier. DNO are not responsible for fitting isolators it is really the suppliers responsibility and they are not interested. Some DNO will not even replace them when they fail. It is a grey area. Start with DNO then try supplier.
 
Problem now is the DNO is responsible for the supply only up to the outgoing terminals on their cutout. The meter and outgoing side is the responsibility of the supplier. DNO are not responsible for fitting isolators it is really the suppliers responsibility and they are not interested. Some DNO will not even replace them when they fail. It is a grey area. Start with DNO then try supplier.


I can't keep up with all these demarcations of who's responsible for this or for that in the new privatised set up. Seems that it's been made complicated to purposely confuse...

I bet they would be interested if you withheld a couple of standing charge payments to pay for an isolator or replace a failed isolator!! lol!!
 