How do you approach your Rewires?

Discuss How do you approach your Rewires? in the UK Electrical Forum area at ElectriciansForums.net

Got one starting next month. Shouldn't be too bad. Empty 3 bedder. No downlights anywhere (madness i know ). No carpet to lift either. I shall approach it with glee as opposed to my usual hatred of rewires.
 
Five house rewires in forty years speaks volumes as to how much I enjoyed the job.
Of the five I had my arm twisted for four of them. Bloody families!

The other was my own house, couldn’t really get out of doing that. That was almost a never ending project. Divorce twenty years ago finally put an end to it and I’ve never touched domestic wiring since.

Give me a couple of 1000KVA transformers and the MV/LV switchgear, I’m happy.
 
Lights first day, upstairs in the morning (usually done by bait) then downstairs, once they are out of the way get all the power pulled in then come mid week it's time to wreck the spot and do the chasing, then it's 2nd fix and do the DB and testing last, that's how we used to do them (pretty much always occupied council with a week per house) thesedays if anyone asks I bang a daft quote in and hope I never hear from them again, I don't mind doing the odd new build house if it's of a decent spec but I avoid domestic as much as I can

give me a dirty horrible plantroom, ankle deep in water any day of the week

(i wear 8 eyelet waterproof boots lol)

waterproof of boots or not mate I'd happily be knee deep in water barefooted in a plant room than do a rewire

plant rooms are usually my favourite bit of the job too, well once the pipeys have ****ed off
 
A few weeks ago I was in a ship's sewage tank connecting the new pump up to the supply and stink pipe. I honestly think I'd rather be doing that day in day out than arguing the ---- with my subordinates over whether to loop at the lights or the switches.

Rewires are fine with me, but unless it's either hi-spec or a job of love I'm not interested.
 
Lights first day, upstairs in the morning (usually done by bait) then downstairs, once they are out of the way get all the power pulled in then come mid week it's time to wreck the spot and do the chasing, then it's 2nd fix and do the DB and testing last, that's how we used to do them (pretty much always occupied council with a week per house) thesedays if anyone asks I bang a daft quote in and hope I never hear from them again, I don't mind doing the odd new build house if it's of a decent spec but I avoid domestic as much as I can



waterproof of boots or not mate I'd happily be knee deep in water barefooted in a plant room than do a rewire

plant rooms are usually my favourite bit of the job too, well once the pipeys have ****ed off
dont go barefoot, this is what you need

f5b8ac5f22e49a241bef80a193fb5141.jpg
 

Reply to How do you approach your Rewires? in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top