Well after being assigned the job again after new bits arrived it now seems tech guy agrees with me and he has a RCBO.
Also found he has everything for a ring not a radial.
After questioning him as to which he wanted radial or ring as I was originally told radials he now wants ring.
After another quick question he has spat his dummy and said to leave the job and he is getting one of the other engineers to do it.

So thanks for the advice to everyone who replied
 
Well after being assigned the job again after new bits arrived it now seems tech guy agrees with me and he has a RCBO.
Also found he has everything for a ring not a radial.
After questioning him as to which he wanted radial or ring as I was originally told radials he now wants ring.
After another quick question he has spat his dummy and said to leave the job and he is getting one of the other engineers to do it.

So thanks for the advice to everyone who replied
He should use a DB and D/P Rcbos feeding radials, a single rcbo feeding all those SMPS is bound to have lots of earth leakage.
 
He should use a DB and D/P Rcbos feeding radials, a single rcbo feeding all those SMPS is bound to have lots of earth leakage.
At the moment the desks are fed from two existing towers with an RCD each in the DB.
8 times the amount of computers than will be on the two new towers.
Never been a problem.
The new towers are being fitted to do away with extention leads feeding the desks furthest from the towers.
 