llywelyn111

Had a quality one today. Went to a job today that I've kind of put off for about 6 months. Wanted to replace 12v downlights with 230v LED ones. So off I went to turn off the MCB, Looked up at the CU, Hager board 100a isolator and two RCBO's for down stairs sockets. Great I though. I then noticed the water wasn't bonded right under the CU, easy 5 min job. The house was rewired about 10-15 years ago.

I looked up at the cut out and meter which was changed 2010 according to the sticker. I had to double take what I saw. The new cut out with a earth connection block. No 16mm earth! Well no earthing cable at all! Opened up the CU, there had been earth in the board as the screw was loose. Ze was 425 ohms.

When they replaced the cut out and meter the earth must of been to short and forgot to replace it. I love DNO's
 
had a pme upgrade this week, i asked the customer "my sister"to ask them to please connect an earth , didnt have any 16mm so i rushed across town and the fitted it.
second hand pme head! dust old crud!
looked down the second live hole and a blank was missing so they had stuffed a 7mm brown rawl plug down there! nice....!
 