S
SYKRAPS
I went to survey and price a job in Leeds on Friday which was th re-wire of a 2 bedroomed terraced property, it was fairly straight forward and was getting a full renovation it was empty and the ceilings were going to be dropped before it was to be started.
I priced the job and gave the potential client a price whilst on site of £2000 + VAT to which he explained that was roughly what he was expecting, I thought great we are in the right area on price and weighing up the meeting I asked when he would like us to start.
At this point he explained to me that he had 2 lower quotes one for £1300 and another for £1050, FFS why are electricians de-grading our trade so much? So the lower priced guy is willing to do the work for £650 materials and £400 labour.
What chance do we stand if people are willing to be so cut throat to break less than even?
Any of you guys finding the same in your areas?
I priced the job and gave the potential client a price whilst on site of £2000 + VAT to which he explained that was roughly what he was expecting, I thought great we are in the right area on price and weighing up the meeting I asked when he would like us to start.
At this point he explained to me that he had 2 lower quotes one for £1300 and another for £1050, FFS why are electricians de-grading our trade so much? So the lower priced guy is willing to do the work for £650 materials and £400 labour.
What chance do we stand if people are willing to be so cut throat to break less than even?
Any of you guys finding the same in your areas?
