I went to survey and price a job in Leeds on Friday which was th re-wire of a 2 bedroomed terraced property, it was fairly straight forward and was getting a full renovation it was empty and the ceilings were going to be dropped before it was to be started.

I priced the job and gave the potential client a price whilst on site of £2000 + VAT to which he explained that was roughly what he was expecting, I thought great we are in the right area on price and weighing up the meeting I asked when he would like us to start.

At this point he explained to me that he had 2 lower quotes one for £1300 and another for £1050, FFS why are electricians de-grading our trade so much? So the lower priced guy is willing to do the work for £650 materials and £400 labour.

What chance do we stand if people are willing to be so cut throat to break less than even?

Any of you guys finding the same in your areas?
 
basically....you were lied to there.....
as you have already said....you came in at a price that the person ordering the work was familiar with....
usual trick....
lets see how low he will go..
stick to your price here.....
if he don`t like it...then sod `im...
 
I just rewired two lighting circuits in a 3 bed property and charged 1200 all in and mate of mine whose also a spark said he would of charged 1900 +vat
 
well i would suggest Ryan that for the south....you were about rite....
but this from the O/P..well...
look, i know the layout of those types of houses you refer to syk.....and there not an issue as such to wire up.....
they often have a shared supply though so get a Ze first wont you before starting any work there..(should you get the job)...
landlord was it)...lol.....
 
i would like to see a list of points/outlets expected within this dwelling
as usual not enough info
 
well i would suggest Ryan that for the south....you were about rite....
but this from the O/P..well...
look, i know the layout of those types of houses you refer to syk.....and there not an issue as such to wire up.....
they often have a shared supply though so get a Ze first wont you before starting any work there..(should you get the job)...
landlord was it)...lol.....

It was an easy install hence £2K for a new property for a landlords portfolio but £1050 is taking the pi**, I would not bother getting out of bed for that kind of money for a re-wire.

The supply was shared but recently PME'd, I also always check this in this area of Leeds (Harehills) as I have come across many that are connected to Leeds Block.
 
he just wasting your time, dont worry. dont weaste time pricing unless you have time or enjoy it and just shoot off hip with 2k depnding on spec/click mode throughout.£1000 is lot of materials , 1000 for work plus extras if any, in out and walk..

im back working for someone else as i cant be bothered , washing lights, changing ballasts,posi fulsh, smoking happydayssssssssssssssss
 
i would like to see a list of points/outlets expected within this dwelling
as usual not enough info

Its a re-wire that will be peformed to prescribed guidance with roughly 16 sockets, 12 lights, cooker, shower, smokes and combi wiring.

I was not asking for advice on pricing I was having a rant towards people ripping the arse out of our trade.
 
i am doing a large 4 bed house with double garage for £3000 labour only and whether i am write or wrong i always have the work but i never supply materials either the job of main contractor or customer if its private work "simples" lol and mine is by the plan and extra for extras at £20 an hour.
 
This happens remember people will spend £25k on a new car £800 a year to service and £360 a year to valet it at £30 a month but will fight tooth and nail for £20 on a £150 job plus there are the people who want to know how much the materials are.

I am always polite and refuse to say yep can loose some jobs but others like a high standard of customer service ie landlord calls me out to a storage heater problem and is chuffed that I go to see it at 6pm
 
It was an easy install hence £2K for a new property for a landlords portfolio but £1050 is taking the pi**, I would not bother getting out of bed for that kind of money for a re-wire.

The supply was shared but recently PME'd, I also always check this in this area of Leeds (Harehills) as I have come across many that are connected to Leeds Block.
yep.....was thinking harehills when i saw your O/P syk.....most of em round there are PME now.....done a load of EICRs on em......by n large their allrite....most of em are on the 16th.....
theres still quite a few 15th amongst em n all...
what i would do here is run all the 2.5 twins as A3s.....
1 for the living room....and the other to feed the 2 upper floors..(i assume its got a 1st and 2nd floor)......
some of em have ring finals in em....but i don`t see the point with em.....not big enough to justify it..
saying that though i`v had a few that have been
TN-S....some of em were high n all.....
 
Its a re-wire that will be peformed to prescribed guidance with roughly 16 sockets, 12 lights, cooker, shower, smokes and combi wiring.

I was not asking for advice on pricing I was having a rant towards people ripping the arse out of our trade.

Yes ... but were the cheaper sparks offering the same? ;)

For what it's worth, I think the customer was trying it on with you & you're right to stick to your guns.
 