Ok so have had a quick look at a 5 storey house in Knightsbridge just been very recently an nicely refublished. Brought by the client an a interior designer has gone mad wants to move everything from lights to door entry keypads etc, Its all looks good electrically, waiting to see what what paperwork sparks have left.
I will allways try to run new cables rather then joint anything thats not accessible, but i if i get the job then its going to have to be NON ACCESSIBLE joints without any other option solid oak flooring with water under floor heating pipes beneath.
All covered buy 30mA RCDS
but some cables will not be in a safe zone
Whats the best compliant way to joint these?
and would an earthed piece of metal capping be sufficient to cover cables less then 50mm deep?
Any advice would be great
Thanks Dave
I will allways try to run new cables rather then joint anything thats not accessible, but i if i get the job then its going to have to be NON ACCESSIBLE joints without any other option solid oak flooring with water under floor heating pipes beneath.
All covered buy 30mA RCDS
but some cables will not be in a safe zone
Whats the best compliant way to joint these?
and would an earthed piece of metal capping be sufficient to cover cables less then 50mm deep?
Any advice would be great
Thanks Dave