Gentlemen and Ladies (if present).
Is there anywhere that can explain in simple English some of the tick boxes in the test schedule for a new installation. For the most part they make sense but some are (to me ) a bit difficult to follow.
Perhaps someone has compiled a 'For Dummies' style booklet or even a page on this forum.
Many thanks in advance.
Mark.
 
some of the tick boxes
9i4o4RK6T.jpeg
are these ,the write size.:D
 
Gentlemen and Ladies (if present).
Is there anywhere that can explain in simple English some of the tick boxes in the test schedule for a new installation. For the most part they make sense but some are (to me ) a bit difficult to follow.
Perhaps someone has compiled a 'For Dummies' style booklet or even a page on this forum.
Many thanks in advance.
Mark.
I remember thinking the same thing a few years ago Alexander. Some of them were just way too confusing! So one day I sat down and went through the whole sheet checking what each of the regulations marked next to each of the tick boxes actually meant and then I wrote them in plain English on a spare copy of the test schedule sheet(s).

It took ages because when you read the regulation(s) they often refer you to other regulations etc etc. Also, you have to actually understand the regulation! I think I managed to understand most of them and the ones I didn't I posted up on the forum until I understood all of them.

So, basically I've just said the same as Lee but in a much longer way. Post up on the forum the ones you're stuck with :)

Ps.. I lost the sheet I made a long time ago.. sorry!
 
I remember thinking the same thing a few years ago Alexander. Some of them were just way too confusing! So one day I sat down and went through the whole sheet checking what each of the regulations marked next to each of the tick boxes actually meant and then I wrote them in plain English on a spare copy of the test schedule sheet(s).

It took ages because when you read the regulation(s) they often refer you to other regulations etc etc. Also, you have to actually understand the regulation! I think I managed to understand most of them and the ones I didn't I posted up on the forum until I understood all of them.

So, basically I've just said the same as Lee but in a much longer way. Post up on the forum the ones you're stuck with :)

Ps.. I lost the sheet I made a long time ago.. sorry!
most of them are pretty easy to understand in laymens terms, but the legalease the regs book is written in used to drive me up the wall at college, its as if they were just padding the regs out with words to make more pages..
 
I'm not remotely a fan of these schedules. I think they are unnecessary and confusing.

For example:

1.3 Distributor's earthing arrangement

3.1 (a) Distributor's earthing arrangement or installation earth electrode arrangement

So which is relevant to the Distributor's earthing arrangement?

To my mind these boxes serve no purpose whatsoever. (And I don't just mean the ones mentioned - I mean all of them. A simple signature that the installation has been inspected against the Requirements of BS7671 should be adequate instead of pages upon pages of crap.
 
Last edited:
I'm not remotely a fan of these schedules. I think they are unnecessary and confusing.

For example:

1.3 Distributor's earthing arrangement

3.1 (a) Distributor's earthing arrangement or installation earth electrode arrangement

So which is relevant to the Distributor's earthing arrangement?

To my mind these boxes serve no purpose whatsoever. (And I don't just mean the ones mentioned - I mean all of them. A simple signature that the installation has been inspected against the Requirements of BS7671 should be adequate instead of pages upon pages of crap.
They are check lists which are not necessary for competent persons, same as the one with the eicr.
 
I'm not remotely a fan of these schedules. I think they are unnecessary and confusing.

For example:

1.3 Distributor's earthing arrangement

3.1 (a) Distributor's earthing arrangement or installation earth electrode arrangement

So which is relevant to the Distributor's earthing arrangement?

To my mind these boxes serve no purpose whatsoever. (And I don't just mean the ones mentioned - I mean all of them. A simple signature that the installation has been inspected against the Requirements of BS7671 should be adequate instead of pages upon pages of crap.

Pass the above to the IET
Suggest they return to planet earth where page upon page of utter garbage is now frowned on
 
To my mind these boxes serve no purpose whatsoever. (And I don't just mean the ones mentioned - I mean all of them. A simple signature that the installation has been inspected against the Requirements of BS7671 should be adequate instead of pages upon pages of crap.

I look forward to seeing you posting that in reply to one of BAS's raving replies on donuts:)
 
Thanks Risteard. What a vast improvement these certificates are on the ones we use over here!
 
Thanks Risteard. What a vast improvement these certificates are on the ones we use over here!
I should add that when Cert No. 3 was introduced it came with a requirement to attach a copy of the Test Record Sheet (essentially the equivalent of the Schedule of Test Results) - but this is a new requirement so does not apply to Cert Nos. 1 or 2 at this time.

Cert No. 1 is essentially for domestic (and small commercial) - anything less than 50kVA.

Cert No. 2 is essentially for industrial (and large commercial) - anything greater than or equal to 50kVA.

Cert No. 3 is for existing installations only and cannot be used to get a supply from the DSO.

Agricultural installations have a supplementary agricultural cert, and people only certifying part of an installation (e.g. lift installation) supply a Sub-system Certificate.
 
I'm not remotely a fan of these schedules. I think they are unnecessary and confusing.

For example:

1.3 Distributor's earthing arrangement

3.1 (a) Distributor's earthing arrangement or installation earth electrode arrangement

So which is relevant to the Distributor's earthing arrangement?

To my mind these boxes serve no purpose whatsoever. (And I don't just mean the ones mentioned - I mean all of them. A simple signature that the installation has been inspected against the Requirements of BS7671 should be adequate instead of pages upon pages of crap.

Hear Hear Risteard. Spot on post that.

I would like to what the plain English campaign would make of the various forms, especially the checklists - it's gobbledygook to Joe and Josephine Public..
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
uk

Thread Information

Title
Make it simple for Dummies.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
32
Unsolved
--

Advert

Thread statistics

Created
alexander jackson,
Last reply from
NDG Elecs,
Replies
32
Views
4,233

Advert