L

londonfire

Just had a return call from mk in regards to 100a main switches.

They have offered £50 to check each switch and a further £70 if they need changing or the stock option of

20 double sockets to check and a further 30 if it needs changing.

Now to decide if i want £500 or 250 sockets!
 
take the money.no, gamble, no, take the money.
 
Take the money the sockets are no longer the standard they once were ie put in 2 single cores and watch on jump out
 
On their website it sounded like they'd lined up their own contractors to check and replace if necessary, they were just after info from the original installers. Maybe there's more urgency than they first suspected or maybe it's turning into a bigger task than they thought.
 
They want them checked within the next two weeks according to the gentleman that called earlier.
 
'£50 to check each switch and a further £70 if they need changing' How do these rates compare to normal electrical rates?
 
'£50 to check each switch and a further £70 if they need changing' How do these rates compare to normal electrical rates?

Depends. £50,000 a year are what the electricians are on here.















According to the adverts anyway.......
 

OFFICIAL SPONSORS

Back
Top